Laserfiche WebLink
Electrical - conduit to wall switches and wall and floor <br /> outlets to accon~nodate typewriters and micro- <br /> computers <br /> Based on electrical contractor's estimate 3,000.00 <br /> <br /> Mechanical - Labor cost of moving ductwork 900.00 <br /> Chalkboards - 3 x $115 345~00 <br /> <br />Area B <br /> <br /> Chalkboards - 6 ~ $115 690.00 <br /> Carpentry - Miscellaneous 500.00 <br /> 1,190.00 <br /> <br />Area C - Restrooms <br /> <br />Tear out wall 75.00 <br />New Wall - 10' x $25/lin. ft. 250.00 <br />2 Fixtures - Handicapped 400.00 <br />2 Fixtures 500.00 <br />Metal Partitions 900.00 <br />80 manhours @ $20 1,600.00 <br /> 3,725.00 <br />Outside Landscaping <br />Install overhead lights and night lights 200.00 <br />Kill poison oak vines in rear of bldg. 120.00 <br /> 320.00 <br /> <br /> Sub Total - Concord 17,066.50 <br /> <br /> Kannapolis Renovation - Estimated Cost <br /> <br />Install thermostat 75.00 <br />Service boiler and controls 50.00 <br />Install new elecgrical panels and change <br /> electrical service 700.00 <br />Paint additional classroom 200.00 <br />Replace broken windows 150.00 <br /> 1,175.00 <br /> <br /> Grand Total Capital Outlay 18,241.50 <br /> <br /> <br />