Laserfiche WebLink
y P ecl Cheek app opri t box( s): <br /> Type E]Pre-Development [~Development <br /> [~ Oesign for Development [[]Acquisition <br /> Check appropriate box: <br /> Cb esen <br /> O P[ope~ly [[]Residential (single family) [[]archaeological Site <br /> Use ~]Residential (multi-family) ~]Cormaercial <br /> [~Museum E]Industrial <br /> E]Governmental {~Transportatien <br /> [~Recreational (theatre, carousel, F]Agricultural <br /> etc.) ExplainOld Courthouse Theatre ~]Other. <br /> ExplainVisual arts work~ ~op/ <br /> gallery <br /> Future Briefly describe your plans for future use of the property. For <br /> acquisition of development rights or remainder interest, indicate <br /> Prcper~ immediate and long-range needs for acquiring such rights: The applic, at <br /> Use has already established an effective pattern of use for the buildi~ . <br /> ~f <br /> (Historic Cabarrus, Inc., Cabarrus Art Guild, Junior Charity.League <br /> Concord, Inc , the Memorial Library and Museum and The 01d Courthou: <br /> Theatre). pay rent to provide operational and maintenance expenses. <br /> These organizations are dedicated to the buildingls materializing i~to <br /> [~ P~)ject Provide a brief description of the proposed project including work <br /> to be carried out in 1982 and work to be carried out in subsequent <br /> Description years. In addition to the brief narrative, list in priorit~ order <br /> <br />The proposed development project for Cabarrus County Courthouse (1876) in 1982 <br />consists of: (1) Emergency exterior and interior repairs (2) Installation of fire/ <br />smoke/intruder systems and (3) Improved access for handicapped and elderly people. <br />The roof on the Courthouse is leaking badly. This bas produced significant damage <br />to the plaster roof and walls. It bas also accelerated the deterioration of original <br />essential.if we a~e.to prevent further deterioration.ip the building. <br />The second floor of the Courthouse now houses a 230 seat theatre. In order to im- <br />prove the fire and safety standards and to protect the $200,000 in equipment and improve- <br />fire/smoke/intruder detection s~stem be installed. New wiring throughout the building wi. <br />Finally, a fire escape and elevator need to be installed, This will facilitate <br />emptying of the theatre in an emergency aRd provide handicapped individuals access to <br />the theatre located upstairs in the building. Because a very large number of people use <br />the building, we feel it imperative to update the fire and emergency systems immediately. <br /> <br /> <br />