Laserfiche WebLink
Company Bid Deposit <br /> <br />R.B. Cook Construction Yes <br />Cabarrus Construction Yes <br />Brown'Heating & Air Yes <br />M.L. Eudy Co. Yes <br />Ritchie Heating Yes <br />Central Comfort Co. Yes <br />Quesenberry Electric Yes <br />R.D. Franklin Yes <br />County Electric Yes <br />Rockwell Radio Electric Yes <br />Howard Electric Co. No bid bond <br />J. E. Taylor Electric Yes <br />E.L. Morrison Lumber Co. Check <br />Cabarrus Builders Mart Yes <br />Gulledge Building Supply Yes <br /> <br />Barn Winterization - Frank Liske Park <br /> <br /> Bid Summary <br /> <br />Base Bid #1 Base Bid #2 Base Bid #3 Base Bid #4 Alt. #1 <br />Contr.-Labor Heating and Building Contr.-Labor <br />& Insulation- Electrical A/C Materials & Insulation <br />Upper Level Lower <br /> <br />Alt. #2 <br />Electr. <br />Lower <br /> <br />$ 6,975.00 <br />11,949.00 <br /> <br />$ 2,940.00 <br /> 3,670.00 <br /> 4,995.00 <br /> 4,490.00 <br /> 4,170.00 <br /> 5,200.00 <br /> <br />$ 7,820.00 <br />6,500.00 <br />11,845.00 <br />7,300.00 <br /> <br />$ 5,154.76 <br /> 5,297.77 <br /> 4,836.33 <br /> <br />$ 2,825.00 <br /> 2,558.00 <br /> <br />$2,600.00 <br /> 2,690.00 <br /> 3,130.00 <br /> 2,860.00 <br /> 2,447.00 <br /> 3,950.00 <br /> <br /> Alt. #3 <br />Materials <br />Lower <br /> <br />$ 1,512.29 <br /> 1,546.35 <br /> 1,453.50 <br /> <br /> <br />