My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1988 09 12
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1988
>
BC 1988 09 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:24:15 PM
Creation date
11/27/2017 12:34:31 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
9/12/1988
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
478 <br /> <br />PURPOSE OF BUDGET REVISION REQUEST: <br /> Cabarrus County Department of Social Services will receive grant funds <br /> through the Community Based Alternatives Program to operate a Home Based <br /> Services Program for youth and their families. The figures above are <br /> for 10 months from September 1, 1988, through June 30, 1989. <br /> Please note that this creates a new Social Worker position. <br /> <br />*New code requested, new line item <br /> <br /> UPON MOTION of Chairman Lentz, seconded by Commissioner Payne and <br />unanimously carried, the Board granted permission for a fireworks display at <br />the Charlotte Motor Speedway on October 9, 1988, at approximately 12:30 P.M. <br />in conjunction with the Oakwood Homes 500. <br /> UPON MOTION of Chairman Lentz, seconded by Commissioner Payne and <br />unanimously carried, the Board granted permission for a fireworks display at <br />Frank Liske Park at 7:00 P.M. on October 23, 1988. <br /> UPON MOTION of Commissioner Melvin, seconded by Commissioner Moss and <br />unanimously carried, the Board adopted the following Revision to Design <br />Standards for Water and Sewer Mains, Lift Stations and Force Mains dated <br />September 6, 1988, as recommended by Mr. W. E. Cochran, Or., P.E. <br /> <br /> CABARRUS COUNTY <br /> <br /> DESIGN STANDARDS FOR <br /> <br />WATER AND SEWER MAINS, LIFT STATIONS AND FORCE MAINS <br /> <br /> Revised September 6, 1988 <br /> <br />A. WATER DISTRIBUTION SYSTEMS <br /> <br />1. DESIGN <br /> Fire hydrant spacing shall not exceed 1000 feet for residential or 500 <br /> feet for non-residential development. <br /> <br />Minimum line size shall be 2". Line sizes of 3" & 4" shall not be <br />allowed. <br /> <br />Blow-offs shall be provided at each dead end. <br />1" for 2" mains. <br />2" for 6" & 8" mains. <br />4" for 12" and larger mains. <br /> <br />Individual 3/4" minimum service connection shall be provided for each <br />lot served. Show on plans. <br /> <br />One copy of The Cabarrus County Construction Specifications and <br />Standard Details will be supplied by the County for the Developer's <br />duplication and use during the bidding and construction phase. <br /> <br />Ail design shall be strictly in accordance with the book. RULES <br />GOVERNING PUBLIC WATER SUPPLIES, Section .0600 through .2600 of the <br />North Carolina Administrative Code, Title 10, Department of Human <br />Resources, Chapter 10, Health Services: Environmental Health, <br />Subchapter 10D, Water Supplies. <br /> <br />e <br /> <br />SUBMITTAL <br />Ail drawings shall be on 24" x 36" sheets. <br /> <br />Minimum scale for drawing shall be 1" = 100'. <br /> <br />Profile is not required for water lines 12" and smaller. Larger lines <br />may require profiles, depending on the location. This decision shall <br />be made by the County Engineer. <br /> <br />Title Block on each sheet shall contain. <br />a. Project name. <br />b. Description of work shown on that sheet. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.