My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2013 08 19 Regular Meeting
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
2013
>
BC 2013 08 19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2013 3:06:39 PM
Creation date
11/27/2017 12:56:52 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
8/19/2013
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 19, 2013 (Regular Meeting) <br />(2) <br />Page 1688 <br />(Ev) Requirements for notifying the POTW in the event of an <br />accidental discharge or slug load as defined in Section <br />1.2(a)(55); <br />(F vi) Requirements to implement a plan or other controls for <br />prevention of accidental discharges and /or slug loads as <br />defined in Section 1.2(a)(55), if determined by the Executive <br />Director to be necessary for the user ; <br />(Gvii)Requirements for immediately notifying the POTW of any <br />changes at its facility affecting the potential for spills <br />and other accidental discharges, or slug load as defined in <br />1.2(a)(55). Also see Sections 5.5 and 5.6; and <br />(Hviii) A statement of applicable civil and /or criminal penalties <br />for violation of pretreatment standards and requirements and <br />any applicable compliance schedule. <br />In addition, permits may contain, but are not limited to, the <br />following: <br />(Ai) Limits on the average and /or maximum rate and time of <br />discharge, and /or requirements for flow regulation and <br />equalization; <br />(Bii) Limits on the instantaneous, daily and /or monthly average <br />and /or maximum concentration, mass, or other measure of <br />identified wastewater pollutants or properties. <br />(Ciii) Requirements for the installation of pretreatment technology <br />or construction of appropriate containment devices, etc., <br />designed to reduce, eliminate, or prevent the introduction of <br />pollutants into the wastewater treatment system. <br />(Div) Development and implementation of waste minimization plans to <br />reduce the amount of pollutants discharged to the wastewater <br />treatment system. <br />(Ev) The unit charge or schedule of user charges and fees for the <br />management of the wastewater discharged to the system. <br />(Fvi) Requirements for installation and maintenance of inspection <br />and sampling facilities and equipment. <br />(Gvii)Specifications for monitoring programs which may include <br />sampling locations, frequency of sampling, number, types, and <br />standards for tests, and reporting schedules. <br />(Hviii) Requirements for immediate reporting of any instance of <br />noncompliance and for automatic resampling and reporting <br />within thirty (30) days where self- monitoring indicates a <br />violation(s). <br />(Iix) Compliance schedules for meeting pretreatment standards and <br />requirements. <br />(Jx) Requirements for submission of periodic self- monitoring or <br />special notification reports. <br />(Kxi) Requirements for maintaining and retaining plans and records <br />relating to wastewater discharges as specified in Section <br />5.13 and affording the Executive Director, or his designee, — <br />access thereto. <br />(Lxii)Requirements for prior notification and approval by the <br />Executive Director of any new introduction of wastewater <br />pollutants or of any significant change in the volume or <br />character of the wastewater prior to introduction in the <br />system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.