My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2012 03 19 Regular Meeting
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
2012
>
BC 2012 03 19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2012 9:33:29 AM
Creation date
11/27/2017 12:57:56 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
3/19/2012
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 19, 2012 (Regular Meeting) <br />Page 993 <br />TMS MAP A' NOT A C0?',7RED SUR✓'Y AND <br />HAS NOT Sc <!J REVIENED 8Y A LOCAL <br />GOVERNMENT AGENCY FM COWUANCE W17Y <br />ANY APPLI -ASLE LAND DEVELOGMEN7 <br />REGULATIONS <br />SCA IN FEET <br />\ P 5 5 5 7 2 <br />P-65041720570000 HfSS <br />D.B. 53 P <br />� iN <br />m CJNCPETE NAIL SR <br />Q MAD NAIL SES $� <br />❑ CONC MCMDMCNS (WND <br />■ CUHC uG,UM[kr •.tT <br />NC OPA M@WM[NS <br />— PPDP[RttIRY N <br />— RM�PoD%T OP WAY I <br />P —T V CONZT[1 L— EASEMCNT <br />E — P211MMRNT — o t[MEXT <br />LTTrr TEMPORARY OOM.TPUCTON <br />� [AD[MIITT AR[A <br />1. Pr k 07E »' LN[S 6NO.M' AS PEH DCCD DDC% 1886 n4 115, <br />CABAPPU� OOUNtt PCGfTi[Y. <br />PIOPT OT WAY MKS ARC OPAWtI AS PCP <br />] FSSTNa R[LORDID nlATS Mro arms. <br />Y LL DIS 9NOWx APE XGP2G[LAL CPCWD Oa51AXCL0 <br />LME7S OTXyNWSC XD101 <br />DJPKY CCkiRCC tf BARD CN nfe NC CWnNOtrJSLY <br />OPEINMNO R[i}]1tNG: sTATNNS (CD45) GM NLTWOHN. <br />. i +D w(NURDxoO� <br />ceartx Loves I ATE [Srf4 POi 51N[KttC. <br />5, MCA CCMPU]LD 0T CDOPDIkATE METHOD. <br />S. RLCCRO CALLS SNCWN W PMCHn1f95' <br />0. W RAT{NI[S u CY].T ON TIIE 9J PRb[RTY n1AT <br />vW At& NDT 9bIN NCRCON. '.. <br />s MY AN.SAV AA9 M� A1C FYAr WAS <br />I %P PFO Aar I[21NnPPOSC DF CASEM£N7 AC�AOM [W.Y <br />AND AC NDT MTCNDED N lK A DWNDAItY SW1£Y OF 71fiE <br />!M1]^CR1Y SNOMN <br />A�1N CAA¢AW PCLfZYSNNAL UNJ SMR'Airt4 L -JE,e <br />EXHI&T MAP <br />VK a °[� n . CITY OF CONCORD Q oERGROUNO UnUTY EASEMENT ACpU[5[noN <br />� DICICSO CABARRUS COUNTY <br />N 26 UNION STREET SOUTH TA Amu THE PROPERTY of <br />_ _ roRUm�nRYd �. —q a <br />, -- CONCORD, NC 280 25 NUMBER ELEVEN TOVMSNIP, CABARRUS COUNTY <br />UPON MOTION of Commissioner Measmer, seconded by Vice Chairman Burrage <br />and unanimously carried, the Board approved the water line easement and <br />granted authority to the County Manager and County Attorney to complete the <br />necessary documents. <br />(F -3) General Services - Sheriff's Department Administration 7th Floor Up£i.t <br />Construction Cost and Construction Manager At Risk Amendment <br />The final design for the SD Admin 7th Floor Upfit has been completed, <br />submitted to Cabarrus County Construction Standards, and bid out by Turner <br />Construction Company. Turner Construction Company has provided a Guaranteed <br />Maximum Price (GMP) of $1,484,360.00. An amendment to the existing <br />Construction Manager at Risk Contract for the Detention Center has been <br />developed. The Amendment, as presented in the Agenda, is hereby incorporated <br />into the meeting minutes by reference. <br />UPON MOTION of Commissioner Measmer, seconded by Vice Chairman Burrage <br />and unanimously carried, the Board approved Amendment No. 5 to the contract <br />for Construction Manager at Risk for the construction of the Cabarrus County <br />Detention Center between Cabarrus County, owner, and Turner Construction <br />Company, Construction Manager at Risk. Further, the Board authorized the <br />County Manager to execute the contract on behalf of Cabarrus County, subject <br />to review or revisions by the County Attorney. <br />The Amendment and Executive Summary are as follows: <br />AMENDMENT No. 5 TO THE CONTRACT FOR CONSTRUCTION MANAGER AT RISK FOR THE <br />CONSTRUCTION OF THE CABARRUS COUNTY DETENTION CENTER BETWEEN CABARRUS COUNTY, <br />OWNER, AND TURNER CONSTRUCTION COMPANY, CONSTRUCTION MANAGER AT RISK. <br />Pursuant to Article 7 of the Contract, the owner and the Construction <br />manager established a Guaranteed Maximum Price and the contract time for the <br />work as set below; <br />ARTICLE 1- GUARANTEED MAXIMUM PRICE <br />The Construction manager's Guaranteed Maximum Price for the <br />construction of the Detention Center and associated Site work, including the <br />estimated Cost of Work as defined in the Contract and the Construction <br />Manager's Fee as there in defined is: <br />$1,484,360 <br />This price is for the performance of the Construction of the 6 & 7th floor up <br />fit and alterations in accordance with the Contract Documents and the <br />following exhibits: <br />7A <br />CABARRUS COUNTY <br />D.H. 2685 PG 725 <br />PIN 5G5020557E0000 <br />O wNt uAw�t ra+w <br />• e[DN uAR%[it CET <br />A STONE POWO <br />NGGL'C T' f 0 PX NuL PCU.yD <br />C fpni,SRpy ® P2 IUR 2T Q <br />CO[@6Wm 3C'Alf Q CDNPMiW MT 6 <br />FACTgt �.p8pCS1.5, <br />Exhibit I Guaranteed Maximum Price Breakdown, Amendment 5 (Book dated <br />March 5 2012 including Exhibits A through M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.