Laserfiche WebLink
March 19, 2012 (Regular Meeting) Page 994 <br />Exhibit II Assumptions and Clarifications (Exhibit F of the Turner 6 th & 7 th <br />Fl. Alteration Amendment 5 Book dated March 5 th , 2012) <br />Exhibit III Matrix for The General conditions and Construction <br />Management Fee (Exhibit 1 of the Turner CM at Risk Contract) <br />Exhibit IV Contract document list (Exhibit H of the Turner 6 th & 7 th Fl <br />Alteration Amendment 5 Book dated March 5 th , 2012) <br />Exhibit V Basis of the Estimate (Exhibit D of the Turner 6 th & 7 th Fl. <br />Alteration Amendment 5 Book dated March 5 th , 2012) <br />ARTICLE 2- CONTRACT TIME <br />The Date of Substantial completion established by this amendment is <br />July 17, 2012. <br />Owner: Cabarrus County, North Carolina <br />/s/ Michael K. Downs <br />County Manager <br />CM at Risk: Turner Construction Company <br />/s/ Gary Stradowski <br />Vice President and General Manager <br />Turner Exhibit C <br />CABARRUS COUNTY SHERIFF'S DEPARTMENT <br />AMENDMENT # 5 TO THE GMP - 6 TH and 7 TH FLOOR ALTERATIONS <br />EXECUTIVE SUMMARY <br />The cost for Amendment #5 to the GMP - Sheriff's Department 6 th and 7 th Floor <br />Alterations at the Cabarrus Detention Center and Sheriff's Department project <br />in Concord, NC, is $1,484,360.00 <br />1) Griffin Architecture, P.A. construction drawings for the Cabarrus <br />County Sheriff's Department - 6 th and 7 th Floor Alterations dated January <br />17, 2012. (See Documents List Log in Exhibit H, attached) <br />2) Griffin Architecture, P.A. project manual for the Cabarrus County <br />Sheriff's Department - 6 th and 7 th Floor Alterations dated January 17, <br />2012. (See Documents List Log in Exhibit H, attached) <br />3) Griffin Architecture, P.A. Addenda numbers 1 and 2 (dated January 31, <br />2012 and February 20, 2012). <br />4) Turner Construction's Clarifications and Assumptions attached within <br />this Amendment. <br />The summary below details the cost of Amendment # 5: <br />Trade Package Cost $1,159,815 <br />Subguard Program $7,846 <br />Turner /Liability Insurance $14,487 <br />Direct Work Sub -Total $1,182,148 <br />Payment and Performance Bond $11,145 <br />Builder's Risk Insurance $1,076 <br />Cost of the Work Total $1,194,369 <br />Turner General Conditions $135,336 <br />Turner CM Fee $57,369 <br />Total $1,387,074 <br />Contractor's Contingency of 4% <br />On the Cost of the Direct Work $47,286 <br />Project Total $1,434,360 <br />Allowance - Owner's Contingency $50,000 <br />Amendment # 5 to the GMP $1,484,360 <br />This Amendment # 5 to the GMP is based on Owner acceptance on March <br />19 2012. <br />