Laserfiche WebLink
November 5, 2012 (Work Session) Page 1277 <br />RCCc - one time project fundmg request <br />Expansion and renovation of Building 3000 5 380,000 Funded in June 2012 <br />he County funded the addition of 3,000 neu square and the renovation of _*,000 existing square feet at <br />Building 300 on South Campus_ This space ,ill provide for multi - purpose, student commons, food ser,,ce, <br />and classroom space. <br />*_ Building 3000 ; 10,800,000 <br />Build a 60,000 square foot building with three le'.-els for classrooms, computer rooms, vocational labs, <br />workshops, instructional and administrative offices, and the Central Engineering Plant for the Campus. <br />estimated construction cost of , ISO per square for (FY2013 values) <br />2 land and Roadway into Stanly Works $ 1,70,000 <br />RCCC believes a western access tying into the Stanley works entrance road off of hWY 73 would be a <br />very efficient route and would improve access to seyv_ral properties in the area. This route would be approximately <br />3000 Linear feet and require a 50 foot right of way. Purchase of 35 acres for a total cost of $350,000 and estimating to <br />construct the 3o0 linear feet of standard width two -lane roadway at S45Q. LF would be $1,350,000 (Fy 2013 values) <br />3 Energy conservation Assures $ 153,000 New <br />Duke Energy was contracted with this past spring to perform an energy audit of the south campus of RCCC. <br />The energy sa-Ang identified are bâ–ºdieved to achi_oe a a year payback from sarongs to cm-er the cost This <br />roil provide a reduction in operational cost which the funds could be used for other cost associated with the college. <br />A discussion ensued. Vice Chairman Burrage requested more information <br />regarding the additional project for RCCC and discussion continued. <br />Cabarrus County <br />Cabarrus County - one time project funding fat <br />1 MCNC Fiber Construction $ 92,000 Funded 9117/2012 <br />This project wil supply dark fiber between Human W. ices Building and the Government Center_ This fiber <br />wil l tie_ the county into MCNC's broadband technology opportunities Program (BTOPj <br />2 Courtroom Technology upgrades S 30,000 Funded 9/17/2012 <br />The superior court room ?1 lacks mcrophcrnes and audio amplification. several of the district courtrooms <br />need microphone upgrades. vbdeo presentation ability in all court rooms is lacking. Expand the Public <br />wi-Fi available in the libraries to the Courthouse- <br />3 Senior Center up fit 250,000 architect hired, Better Pricing and options in December 2012 <br />This project involves reailoating space v ithin the facility to provide adilmonal classroom and remove a wall to <br />expand the exercise room in to a multi purpose spat= <br />S oy Parking tot :, 150,000 <br />This project would gravel an overflow parking lot at Frank tiske Park <br />This project would not need to be funded if project 6 was selected in full. <br />5 Senior Center up ftt,rexpansion 5 700,000 architect hired, Better Pricing and Options in December 2012 <br />This project imroh. the senior Center unfit aba. plus the expansion of the facility to provide an additional <br />1oo0 square feet on the front of the building An Ardutect will be required to yalidat =_ the total amount of funds <br />that will be needed for this project <br />6 Multi - purpose Athletic Field Complex 5 2, 239,000 Updated Cost including Construction Materials Testing Sur: eying <br />This project .add praride 2 artificial surfaced multi - purpose athletic fields with tights and additional associated parking <br />This project could get possible funding support from the Cabarrus Visitor, Bureau ICV5). <br />7 Joint EMS /Fire Station located in the Concord mills Area I S 375,000 New Project <br />This project wodd pravide adequate space for Et.0 to house staff and equipment to run calls from this joint facility, approximately 1,700 sq ft <br />we would anticipate entering into a lease with concord similar to the agreement we currenth j have with kannapola for shared space <br />Mike Downs, County Manager responded to questions from the board <br />concerning the Joint EMS /Fire Station project and the Senior Center Upfit <br />Project. More details will be provided over the next month. Discussion <br />continued. <br />Chairman Poole expressed support for Cabarrus County item numbers 3) <br />Senior Center upfit, 5) Senior Center upfit, and 7) Joint EMS /Fire Station <br />located in the Concord Mills Area. <br />Vice Chairman Burrage expressed opposition to voting for Cabarrus <br />County item numbers 4) Overflow Parking Lot at Frank Liske Park, 5) Senior <br />Center upfit /expansion, and 6) Multi - purpose Athletic Field Complex. <br />Commissioner White expressed support for item number 6) Multi- purpose <br />Athletic Field Complex. <br />During discussion, Mike Downs, County Manager, responded to questions <br />from the Board. Chairman Poole suggested Item (6) (Multipurpose Athletic <br />Field Complex) be placed on the Retreat Agenda for further review; discussion <br />continued. <br />CCS - (Cabarrus County Schools <br />