My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2010 06 21 Regular Meeting
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
2010
>
BC 2010 06 21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 1:20:03 PM
Creation date
11/27/2017 1:01:50 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
7/20/2010
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 21, 2010 (Regular Meeting) <br />Other new construction fees: <br />Mobile Home $103.00 <br />Daycare /Group Care /Foster Care Home Inspection $103.00 <br />Temporary Construction Trailer Permit $103.00 <br />Replacement Building Permit Cards $ 3.00 <br />Retaining Wall Permit $ 25.75 <br />PLAN REVIEW AND GENERAL POLICY <br />Plan Review - $51.50 base fee plus .0309 /square foot <br />Pa ge 5 <br />Callback Fee - A $50.00 callback fee will be charged for re- inspection for <br />any return trip to a site due to owner, contractor or sub - contractor being <br />unprepared for the original inspection. <br />Other building permit fees: <br />Special event tents (for religious, exhibition, political, secular, amusement <br />or commercial purposes) - $25.75 per tent. <br />Certificate of Occupancy for Existing Buildings - $20.00. <br />(For businesses who locate in an existing commercial building where no <br />construction occurs in preparation to operate the business. This Certificate <br />of Occupancy shall be issued only after approval from the applicable zoning, <br />building inspection, fire, health, engineering and sate agencies having <br />jurisdiction. <br />cr nrTT L 0 <br />Building permit for the alteration, demolition, remodel, removal, <br />repair, re- roofing, or reconstruction of any structure. This schedule <br />also applies to accessory buildings. <br />Value of Construction <br />$ 0 - $1,000 <br />1,001 - 5,000 <br />5,001 - 15,000 <br />Permit Fee <br />$25.75 <br />36.05 <br />77.25 <br />Estimated construction cost above $15,000 will be charged an additional $3.00 <br />per additional $1,000 value, plus 3% Technology Fee. <br />Callback Fee - A $50.00 callback fee will be charged for re- inspection for <br />any return trip to a site due to owner, contractor or sub - contractor being <br />unprepared for the original inspection. <br />MECHANICAL PERMITS <br />UNIT /FIXTURE DESCRIPTION FEES <br />A/C Units - 1 hp to 5 hp <br />Greater than 5 hp constitutes and additional unit $36.05 <br />Heating Units - 0 to 150,000 BTU <br />Greater than 150,000 BTU constitutes an additional unit $36.05 <br />Gas Piping $25.75 <br />Boilers (150,000) $25.75 <br />Thru -wall heating and cooling units $25.75 <br />Wall furnace, Floor furnace, and Unit Heaters $25.75 <br />Commercial Exhaust Hoods $51.50 <br />Commercial Dryers $51.50 <br />Replace Heating 0 (150,000 -5t) (no duct work) $25.75 <br />Cooling $25.75 <br />Fan Coil (Heating and /or Cooling) $25.75 <br />Conversion Burner (150,000) $25.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.