Laserfiche WebLink
October 5, 2009 (Work Session) Page 1641 <br />costs would be required, just the purchase of the property. Mr. Downs <br />reported Coldwater Ridge located off Lake Concord Road and Roxie Street near <br />the Northlite development was another site investigated and the corresponding <br />site costs would be $350,000.00 which includes costs for stormwater detention <br />and soil leveling. <br />Mr. Downs reported the third location surveyed was the International <br />Business Park located on International Drive which has two separate sites. <br />The first site, an existing flat site, located directly across Fortune Drive, <br />would incur $125,000.00 in site costs; and the other site located across the <br />street from Walker Marketing would require $250,000.00 in site costs. He <br />stipulated the costs identified do not include the properties, and informed <br />Yates-Chreitzberg-Hughes Architects did a comparison of the properties and <br />found they all were comparable in cost to the old fairgrounds property. He <br />provided an illustration of the elevations of the originally designed <br />building and stated the County was anticipating constructing a LEED-certified <br />structure with many windows and metaling on the exterior; however, it did not <br />meet the City of Concord's small area plan requirements which required more <br />brick and less metal and glass. He conveyed this was the County's design <br />preference and that the architects produced a second design that incorporated <br />brick in the elevations. <br />Jonathan Marshall, Commerce Director, stated the design standards are <br />part of the Concord ordinance and the International Business Park site would <br />have to comply with the same design standards. He further stated the Afton <br />Ridge and Coldwater sites are both in the City of Kannapolis, and Kannapolis <br />has verbally confirmed the utilization of the initial design allowing the <br />architectural metal panels at those locations. <br />Mr. Downs stressed if the old fairgrounds or the International Business <br />Park sites are selected, the County will have to go back through the Concord <br />Planning and Zoning Board's review process which can take up to 60 days. He <br />made an appeal for the Board to make a decision on a site as the design of <br />the building is on hold until a decision is made. <br />Commissioner Poole questioned the estimated total costs of the building <br />and land, whether brick veneer increases the cost, and the functionality of <br />the building. Mr. Marshall stated the County started putting together some <br />land costs but did not have enough confidence in it to present it to the <br />Board. Mr. Downs pointed out that a site has not been selected so the County <br />cannot negotiate a price for the Board's review. <br />John Day, County Manager, stressed it would not be an option if the <br />price of the property is not less than the cost of the old fairgrounds. He <br />stated although the old fairgrounds property was originally designed as a <br />campus that could be expanded, the County does not foresee the need to expand <br />the property. <br />Commissioner Poole inquired about the disposition of the old <br />fairgrounds property if the campus is not built on it. Chairman White <br />responded that the old fairgrounds property is in the Downtown Sma11 Area <br />Plan which is extremely restrictive noting very little can be done with the <br />property other than leaving it vacant. He added the County is being forced <br />out of being able to make the property a viable parcel or a nice gateway to <br />the City, and that the County will have to strategize how to optimize the <br />restrictive land not only in terms of design but also placement and location <br />of the building. <br />Chairman White sought clarification on how the Pre Gel building was <br />erected noting that although the International Business Park is under the <br />same ordinances, it cannot use metal siding and is restricted on the number <br />of windows that can be included. Mr. Marshall responded, in conjunction with <br />the old fairgrounds site, the County is subject to both the small area plan <br />and commercial design standards. Also, the commercial design standards which <br />are in effect throughout Concord's jurisdiction include the I-1 zoning at <br />IBP. He noted the ordinance allows masonry and concrete, but it is the metal <br />that it does not permit. He further explained PreGel has less than 20 <br />percent metal. Chairman White questioned whether the building could be <br />constructed of masonry and concrete instead of brick. Mr. Marshall responded <br />in the affirmative. Mr. Day stated the appearance is the same which is the <br />issue that was discussed with City staff. He noted the reasoning behind the <br />ordinance appears to be related to prefabricated metal buildings. He Further <br />stated the building could look exactly like the diagram if structural <br />concrete is used, which is less expensive. <br />