Laserfiche WebLink
June 18, 2007 (Regular Meeting) <br />Page 439 <br />(9) Control Manhole. Any person discharging non-domestic wastewater <br />into WSACC's sanitary sewer shall construct and maintain a suitable <br />control manhole to facilitate observation, measurements and <br />sampling of all wastewater including domestic wastewater from the <br />industry. The control manhole shall be constructed downstream from <br />any treatment, storage or other approved system at a suitable and <br />satisfactory location and built in a manner approved by the <br />Executive Director or his designee. <br />(5) Measuring Device. Where a storage tank is not required, the <br />' control manhole shall be equipped with a permanent type volume <br />measuring device such as a nozzle, or other device approved by the <br />Executive Director. The manhole shall be installed by the person <br />discharging the wastewater at his own expense and shall be <br />maintained by him so as to be safe, accessible and in proper <br />operating condition at all times. <br />(6) Interrupted Service Note. Notice shall be given to the Executive <br />Director or his designee when normal industry will be interrupted <br />for seventy two (72) hours or longer and wastewater will not be <br />available for discharge, or when a change of process is <br />contemplated or malfunction of the treatment facility occurs or is <br />anticipated which will alter demands on the wastewater treatment <br />facilities. Normal operations shall include allowance for legal <br />holidays and other announced plant shutdowns. <br />(7) Users with the potential to discharge flammable substances may be <br />required to install, a-xd maintain and operate at the user's <br />expense, an approved combustible gas detection meter. <br />(8) WSACC may require a user who has the potential to discharge <br />wastewater in violation of pretreatment standards, to install, <br />maintain and operate at the user's expense an approved pH <br />controller and meter related to pH. <br />' Plans for the construction of the equalization tank, control manhole, <br />controlling devices, and volume measuring devices shall be approved by <br />the Executive Director prior to the beginning of construction. <br />2.8 Accidental Discharge/Slug Control Plans <br />(a) The Executive Director shall evaluate whether each significant industrial <br />user needs a plan or other action to control or prevent slug discharges <br />as defined in Section 1.2 (a)(55). All SIUS must be evaluated within one <br />bear of being designated an SIU The Executive Director may require any <br />user to develop submit for approval and implement such a plan or oti ner <br />s-ecific action Alternatively the Executive Director may develop such a <br />plan for any user. <br />(b) Facilities to prevent accidental or sluffdischarges of prohibited <br />materials shall be rovided and maintained at the owner s or user s <br />expense Detailed plans of the facilities and operating procedures must <br />be delivered to and received b WSACC for review before construction of <br />the facility Completion of an accidental or slug discharge plan may be <br />required before a wastewater discharge permit will be issued. Review of <br />such plans and operatin procedures shall not reL.eve the SIU from the <br />responsibility of modifying the SIU's facilities as necessary to meet the <br />requirements of this ordinance. <br />' (c) All SIUS are required to notify the POTW immediately of any changes at <br />its facility affecting the potential or spills, and other accidental <br />dischar e dischar e of a non-routine episodic nature a non-customary <br />batch discharge or a slug load. Also see Sections 5.5 and 5. 6. <br />(d> ~ ~~~e E2) <br />ears <br />-~ <br />a <br />~.._,..~;..,. <br />~~ <br /> ~ <br /> <br /> <br /> <br />