My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2007 06 18 Regular
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
2007
>
BC 2007 06 18 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2007 4:13:24 PM
Creation date
11/27/2017 1:03:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
6/18/2007
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 18, 2007 (Regular Meeting) <br />Page 444 <br />discharge any industrial waste to the POTW or who is now doing so must <br />make a lication to WSACC for a wastewater dischar e ermit. <br />(b) Any industrial user proposing to change the volume or characteristics of <br />an existing discharge shall request from WSACC a determination as to <br />whether or not a new application should be filed and shall provide <br />sufficient information on the ro osed chan e to enable WSACC to <br />determine the need for a new application If the proposed change requires <br />a revision in a current SIU or local ermit or re uires a different t e <br />of permit be issued, the user shall apply to WSACC for an appropriate <br />wastewater discharge permit within 45 days of"the notification <br />(c) When requested by the Executive Director, a user must submit information <br />on the nature and characteristics of its wastewater within thirty (30) <br />days of the request. The Executive Director is authorized to prepare a <br />form for this purpose and may periodically require users to update this <br />information. <br />(d) Any person discharging or proposing to discharge wastewater into the POTW <br />shall be responsible at all times for determinin the vo ltame and <br />characteristics of its existing or proposed discharge <br />4.2 Wastewater Discharge Permits-Requirements <br />(a)(1)All persons meeting one or more of the requirements of an SIU of_this <br />ordinance s~i~~eant 'edasp~a~~ase~a shall obtain an <br />industrial user pretreatment permit prior to the commenceme~o <br />construction or operations which will result in a discharge to the POTW. <br />Existing industrial users who are determined by the Executive Director to <br />be SIUS 'y '~.=anE 'edt~st~#a~-i3se~-a shall obtain a -"'~--~~ <br />industrial user .pretreatment permit within 180 days of receiving <br />notification of the Executive Director's determination. <br />For purposes of this definition, construction or operation has commenced <br />if the owner or operator has: <br />(i) Begun, or caused to begin as part of a continuous on-site <br />construction program: <br />(A) Any placement, assembly, or installation of facilities or <br />equipment; or <br />(B) Significant site preparation work including clearing, <br />excavation, or removal or existing buildings, structures, or <br />facilities which is necessary for the replacement, assembly, <br />or installation of new source facilities or equipment; or <br />(ii) Entered into a binding contractual obligation for the <br />purchase of facilities or equipment which are intended to be used <br />in its operation within a reasonable time. Options to purchase or <br />contracts which can be terminated or modified without substantial <br />obligation under this definition in accordance with that Section <br />with the provisions as stated in 90 CFR 903.3.(x). <br />(2) ~~~ Users who do not fit the SIU criteria may at the discretion of <br />the Executive Director be required to obtain a local <br />pretreatment permit <br />as necessar to Carr out the ur oses of this ordinance. <br />(3) An violation of the terms and/or conditions of a wastewater dischar e <br />permit shall be deemed a violation of this ordinance Obtainin a <br />wastewater discharge permit does not relieve a Permittee of the <br />continuing obligation to comply with all Federal and State pretreatment <br />standards and/or requirements or with any other requirements of Federal <br />State and local law. <br />(b) Si nificant Industrial User Determination <br />All persons proposing to discharge non-domestic wastewater, or proposing <br />to change the volume or characteristics of an existing discharge of non- <br />G <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.