Laserfiche WebLink
June 18, 2007 (Regular Meeting) <br />Page 449 <br /> (ii) Limits on the instantaneous, daily and monthly average and/or <br /> maximum concentration, mass, or other measure of identified <br /> wastewater pollutants or properties. <br /> (iii) Requirements for the installation of pretreatment technology <br /> or construction of appropriate containment devices, etc., <br /> designed to reduce, eliminate, or prevent the introduction of <br /> pollutants into the wastewater treatment system. <br />_, ~, .. <br /> (• - <br />a... <br /> (iv) Development and implementation of waste minimization plans to <br /> reduce the amount of pollutants discharged to the wastewater <br /> treatment system. <br /> (v) The unit charge or schedule of user charges and fees for the <br /> management of the wastewater discharged to the system. <br /> (vi) Requirements for installation and maintenance of inspection <br /> and sampling facilities and equipment. <br /> (vii) Specifications for monitoring programs which may include <br /> sampling locations, frequency of sampling, number, types, and <br /> standards for tests, and reporting schedules. <br /> (viii )Requirements for immediate reporting of any instance of <br /> noncompliance and for automatic resampling and reporting <br /> within thirty (30) days where self-monitoring indicates a <br /> violation(s). <br /> (ix) Compliance schedules for meeting pretreatment standards and <br /> requirements. <br />' (x) Requirements for submission of periodic self-monitoring or <br /> special notification reports. <br /> (xi) Requirements for maintaining and retaining plans and records <br /> relating to wastewater discharges as specified in Section <br /> 5.13 and affording the Executive Director, or his designee,- <br /> access thereto. <br />(xii) Requirements for prior notification and approval by the <br />Executive Director of any new introduction of wastewater <br />pollutants or of any significant change in the volume or <br />character of the wastewater prior to introduction in the <br />system. <br />(xiii)Requirements for the prior notification and approval by the <br />Executive Director of any change in the manufacturing and/or <br />pretreatment process used by the Permit t:ee. <br />, <br />T .., a <br />d <br />~~_ f <br />(xiv) A statement that compliance with the permit does not <br />relieve the Permittee of responsibility for compliance <br />' with all applicable Federal and State pretreatment <br />standards, including those which become effective <br />during the terms of the permit. <br />(xv) Other conditions as deemed appropriate by the Executive <br />Director to ensure compliance with this ordinance, and State <br />and Federal laws, rules, and regulations. <br />(e) General and limited Conditions. <br />(1) The Executive Director is authorized to establish one or more <br />eneral conditions for inclusion in all wastewater discharge <br />