My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2006 06 19 REGULAR
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
2006
>
BC 2006 06 19 REGULAR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 1:04:15 PM
Creation date
11/27/2017 1:04:21 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
6/19/2006
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />June 19, 2006 - Regular Meeting <br /> <br />Page <br /> <br />672 <br /> <br />(G-6) Presentation of the Proposed 2006-2007 Secondary Roads Construction <br />Program for Cabarrus County <br /> <br />D. Ritchie Hearne, P.E., District Engineer with the North Carolina <br />Department of Transportation (NCDOT), presented the proposed 2006-2007 <br />Secondary Roads Construction Program for Cabarrus County. The NC DOT <br />published the Public Notice concerning the presentation in THE INDEPENDENT <br />TRIBUNE on June 4 and 11, 2006, and a copy of the proposed Program was posted <br />on the bulletin board at the Courthouse. <br /> <br />North Carolina Department of Transportation <br />Secondary Roads Construction Program <br />Cabarrus County <br /> <br />FY <br /> <br />05-06 Estimated <br />Highway Fund <br />Trust Fund <br />Total <br /> <br />Balance <br />$ 269,213 <br />$ 458,938 <br />$ 728,151 <br /> <br />I. Paving Unpaved Roads <br /> <br />Programmed Paving Goal: 0.89 Miles <br /> <br />A. Rural Paving Priority <br /> <br />Priority Length Estimated <br />Number SR No. (Miles) Road Name and Description Cost <br />IF SR 2650 0.35 Roundtree Road (previously partially $73,193 <br />funded) - From SR 2617 to SR 2616 <br />2F SR 2118 0.14 Jordan Road - From existing end of $48,565 <br />pavement to end of maintenance <br />3F SR 2302 0.18 Jake Tucker Road $54,207 <br />From SR 1132 to end of maintenance <br />4F SR 2439 1. 80 Vineyard Road (only partially funded) $190,692 <br />From SR 2408 to SR 2416 <br /> <br />Note: Road above that is only partially funded is not included in paving <br />goal mileage. <br /> <br />Total Miles <br /> <br />0.67 <br /> <br />Subtotal <br /> <br />$366,657 <br /> <br />* Rural Paving Alternates <br /> <br />Priority Length Estimated <br />Number SR No. (Miles) Road Name and Description Cost <br />5F SR 2413 0.55 Liberty Ridge Road From SR 2408 $60,000 <br />to end of maintenance <br /> <br />B. subdivision Paving Priority <br /> <br />Priority Length Estimated <br />Number SR No. (Miles) Road Name and Description Cost <br /> SR 2528 0.21 Twinkle Drive From SR 2429 to end $75,271 <br />IF of maintenance <br /> <br />Total Miles <br /> <br />0.21 <br /> <br />Subtotal <br /> <br />$75,271 <br /> <br />* Subdivision Paving Alternates <br /> <br />Priority Length Estimated <br />Number SR No. (Miles) Road Name and Description Cost <br /> SR 1635 Marion Avenue From SR 1639 to $60,000 <br />2F 0.15 Athens Street <br /> <br />*In the event that any roads in priority have to be placed on the \\Hold <br />ListU due to unavailable right of way or environmental review, or if <br />additional funding becomes available, funds will be applied to the roads <br />listed in priority order in the paving alternate list. <br /> <br />II. General Secondary Road Improvements <br /> <br />A. Paved Road Improvements <br /> <br />SR No. proiect Descriotion Est. Cost <br /> Drakestone Road - From Trinity Church Road to <br />SR 1622 Stirewalt Road-Length 0.67 miles $100,000 <br /> Widen from 17 feet to 22 feet as safety project <br /> <br />Subtotal <br /> <br />$100,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.