Laserfiche WebLink
November 13, 2006 (Recessed Meeting) <br />Page 158 <br /> brick. <br /> Provide standard latex thinset in lieu Pending <br />A-96 of epoxy thinset at tile. -$50,000.00 Further <br /> Review <br />A-97 Provide Morse Watchman guard tour system -$45,986.00 Accept <br /> BMS-Use PR Cable in Admin in lieu of <br />M-1 <br />conduit. _$9,050.00 Accept <br />M-2 Change Day room lights from security to -$7 130.00 Accept <br /> vandal proof. <br />*Paul Bonsall requested 20 percent of the interior metal studs remain <br />at 16 gage; therefore, the cost was revised to -$71,515.20. A-33 - Mike <br />Downs, Deputy County. Manage r, reported Concord has to approve the color of <br />the stucco. A-95 - Mr. Downs reported Concord wants to approve the color of <br />the brick. <br />UPON MOTION of Vice Chairman Juba, seconded by Commissioner. Freeman and <br />unanimously carried, the Board accepted or rejected the value engineering <br />items for the Cabarrus County Sheriff's Office (Administration Building and <br />Housing Building) as set forth above. <br />Review of Contract pocumenta for Construction of the Sheriff's Office & <br />Detention Center <br />Cam Mullins, Chief Estimator with Turner Construction Company, reviewed <br />Exhibits A - M of the GMP (Guaranteed Maximum Price) Amendment #2 notebook, <br />dated November 10, 2006, totaling $81,035,296.00 for the Cabarrus Sheriff's <br />Office & Detention Center. <br />Highlights of the presentation included the following: <br />Exhibit B, Amendment # 2 to Contract, was intentionally left blank and <br />will be prepared and submitted by the County Attorney. <br />Exhibit C - Executive Summary: Amendment # 2 to the GMP totaled <br />$81,035,296.00 and is based on Owner acceptance on November 20, 2006, and <br />proof of financing on or before December 6, 2006. January 8, 2007 is the <br />official construction start date; owner occupancy for the Sheriff's <br />Department is August 15, 2006 and owner occupancy for the Detention Center is <br />June 1, 2009. General Conditions and Fee Analysis Summary was $12,179,265.00 <br />or 15.12 percent. <br />Exhibit D - Basis of the Estimate: The total MWBE (Minority/Women <br />Business Enterprise) percentage to-date for Amendment #2 was reported as 9.98 <br />percent; and, a list of contractors that Tuner proposes to utilize on <br />Amendment #2 was provided. <br />Exhibit E - Project Summary: The Project Summary included a summary <br />for 32 trades as well as an Estimating Scope Sheet for each bid package. <br />Exhibit F - Clarifications & Assumptions: This section consisted of 12 <br />pages. The following allowances were mentioned: An allowance of $500,000.00 <br />was included for the purchase and installation of all cabling and equipment <br />for the video visitation system; an allowance of $823,990.00 was included for <br />changes in scope created by Factory Mutual requirements, changes to the <br />documents because of Permit reviews, DFS/DOI reviews to the documents and <br />modifications to the emergency generator locations; and an allowance of <br />$994,242.00 was included for the Corban Avenue waterline replacement work per <br />drawings 1 through 5, revision dated September 7, 2006 by ColeJenest & Stone <br />and sheet 2 dated Oct Ober 12, 2006 by the Engineering Department for the City <br />of Concord. Item No. ll, the punch list procedure, was also reviewed. <br />Exhibit G - List of Allowances: Fourteen allowance items were listed. <br />The three most expensive items were as set forth above in Exhibit F. There <br />was a brief discussion on the allowance for rock removal. <br />Richard M. Koch, County Attorney, arrived at 7:05 p.m. and was present <br />for the remainder of the meeting. <br />Exhibit H - Document List: The Document List section contained a <br />summary log of the most current drawings and specifications. <br />Exhibit I - Issue Reponses: This section contained a log of issues <br />identified by Turner and responses from designers, engineers, etc. <br />