Laserfiche WebLink
N) Ail utilities at a Wireless Telecommunications Facilities site shall be <br /> installed underground and in compliance with all Laws, ordinances, <br /> rules and regulations of the County, including specifically, but not <br /> limited to, the National Electrical Safety Code and the National <br /> Electrical Code where appropriate. <br /> <br />O) Ail Wireless Telecommunications Facilities shall contain a <br /> demonstration that the Facility be sited so as to be the least visually <br /> intrusive reasonably possible and thereby have the least adverse visual <br /> effect on the environment and its character, on existing vegetation, <br /> and on the residences in the area of the Wireless Telecommunications <br /> Facility. <br /> <br />P) Both the Wireless Telecommunications Facility and any and all accessory <br /> or associated facilities shall maximize the use of building materials, <br /> colors and textures designed to blend with the structure to which it <br /> may be affixed and/or to harmonize with the natural surroundings, this <br /> shall include the utilization of stealth or concealment technology as <br /> may required by the County. <br /> <br />Q) At a Telecommunications Site, an access road, turn around space and <br /> parking shall be provided to assure adequate emergency and service <br /> access. Maximum use of existing roads, whether public or private, shall <br /> be made to the extent practicable. Road construction shall at all times <br /> minimize ground disturbance and the cutting of vegetation. Road grades <br /> shall closely follow natural contours to assure minimal visual <br /> disturbance and reduce soil erosion. <br /> <br />R) Ail Wireless Telecommunications Facilities shall be constructed, <br /> operated, maintained, repaired, provided for removal of, modified or <br /> restored in strict compliance with all current applicable technical, <br /> safety and safety-related codes adopted by the County, State, or United <br /> States, including but not limited to the most recent editions of the <br /> National Electrical Safety Code and the National Electrical Code, as <br /> well as accepted and responsible workmanlike industry practices and <br /> recommended practices of the National Association of Tower Erectors. <br /> The codes referred to are codes that include, but are not limited to, <br /> construction, building, electrical, fire, safety, health, and land use <br /> codes. In the event of a conflict between or among any of the <br /> preceding the more stringent shall apply. <br /> <br />S) A holder of a Conditional Use Permit granted under this Ordinance shall <br /> obtain, at its own expense, all permits and licenses required by <br /> applicable Law, rule, regulation or code, and must maintain the same, <br /> in full force and effect, for as long as required by the County or <br /> other governmental entity or agency having jurisdiction over the <br /> applicant. <br /> <br />T) An Applicant shall submit to the County the number of completed <br /> Applications determined to be needed at the pre-application meeting. <br /> Written notification of the Application shall be provided to the <br /> legislative body of all adjacent municipalities. <br /> <br />V) The Applicant shall examine the feasibility of designing a proposed <br /> Tower to accommodate future demand for at least five (5) additional <br /> commercial applications, for example, future co-locations. The Tower <br /> shall be structurally designed to accommodate at least five (5) <br /> additional Antenna Arrays equal to those of the Applicant, and located <br /> as close to the Applicant's Antenna as possible without causing <br /> interference. This requirement may be waived, provided that the <br /> Applicant, in writing, demonstrates that the provisions of future <br /> shared usage of the Tower is not technologically feasible, is <br /> Commercially Impracticable or creates an unnecessary and unreasonable <br /> burden, based upon: <br /> <br />1) The foreseeable number of FCC licenses available for the area; <br />2) The kind of Wireless Telecommunications Facilities site and <br /> structure proposed; <br />3) The number of existing and potential licenses without Wireless <br /> Telecommunications Facilities spaces/sites; <br />4) Available space on existing and approved Towers. <br /> <br />W) The owner of the proposed new Tower, and his/her successors in <br /> interest, shall negotiate in good faith for the shared use of the <br /> proposed Tower by other Wireless service providers in the future, and <br /> shall: <br /> <br /> <br />