Laserfiche WebLink
July 26, 2004 Page 576 <br /> <br />Estimated construction cost above $15,000 will be charged an <br />additional $3.00 per additional $1,000 value. <br /> <br />Callback Fee - A $50.00 callback fee will be charged for re- <br />inspection for any return trip to a site due to owner, contractor <br />or sub-contractor being unprepared for the original inspection. <br /> <br />MECHANICAL PERMITS <br /> <br />UNIT/FIXTURE DESCRIPTION <br /> <br />FEES <br /> <br />A/C Units - 1 hp to 5 hp <br /> Greater than 5 hp constitutes <br /> an additional unit <br />Heating Units - 0 to 150,000 btu <br /> Greater than 150,000 btu constitutes <br /> an additional unit <br /> Gas Piping <br /> Boilers (150,000) <br />Thru-wall heating and cooling units <br />Wall furnace, Floor furnace, and <br /> Unit Heaters <br />Commercial Exhaust Hoods <br />Commercial Dryers <br />Replace Heating 0 (150,000-5t) <br /> (no duct work) <br />Cooling <br />Fan Coil (Heating and/or Cooling) <br />Conversion Burner (150,000) <br />Refrigeration <br />Duct Work <br />Replace heat <br />Replace air <br /> <br />$35.00 <br /> <br />$35.00 <br />$25.00 <br />$25.00 <br />$25.00 <br /> <br />$25.00 <br />$50.00 <br />$50.00 <br /> <br />$25.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$50.00 <br />$25.00 <br />$25.00 <br />$25.00 <br /> <br />There will be a $50.00 callback or re-inspection fee charged for <br />any return trip to a job site if the contractor, subcontractor, <br />or owner is at fault. <br /> <br />.L-',L"' , <br /> <br />Ail commercial mechanical permits for new construction or new <br />projects shall be calculated using the Construction Schedule A, <br />when BTUs (tons) are not applicable. When BTUs (tons) are <br />applicable, the Mechanical Permit fee schedule shall apply. <br /> <br />All commercial mechanical permits for existing buildings, or for <br />projects where any previous construction has occurred, or for the <br />alteration, demolition, remodel, removal, repair, re-roofing, <br />upfit, or reconstruction of any commercial structure or project, <br />shall be calculated usinq the Construction Schedule B. <br /> <br />ELECTRICAL AND MOBILE HOME PERMITS <br /> <br />SIZE OR TYPE OF SERVICE <br />60 Ampere Service <br />100 Ampere Service <br />125 Ampere Service <br />150 Ampere Service <br />200 Ampere Service <br />225 Ampere Service <br />250 Ampere Service <br />275 Ampere Service <br />300 Ampere Service <br />325 Ampere Service <br />350 Ampere Service <br />400 Ampere Service <br />Saw Service <br />Pools, Grounding and wiring <br />Well Services and Signs <br />Change of Service <br /> Up to 200 amps service. <br /> Above 200 amps is based on size of service <br />HVAC wiring <br /> <br /> FEES <br /> $40.00 <br /> $40.00 <br /> $40.00 <br /> $45.00 <br /> $55.00 <br /> $65.00 <br /> $75.o0 <br /> Ss0.00 <br /> $85.00 <br /> $90 00 <br /> $9o 00 <br />$120 O0 <br /> $40 oo <br /> $40 oo <br /> $40 00 <br /> $40 00 <br /> <br />$40.00 <br /> <br /> <br />