Laserfiche WebLink
134 <br /> <br /> 6. The following table of fees or $35.00 per square foot, whichever is <br />greater, shall be established for all NEW CONSTRUCTION: <br /> <br />ESTIMATED COST FEE ESTIMATED COST FEE <br /> <br />$15 000 ....... <br /> <br />16 <br />17 <br />18 <br />19 <br />2O <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />3O <br />31 <br />32 <br /> <br /> 53.00 <br />000 ....... 55.50 <br />000 ....... 58.00 <br />.000 ....... 60.50 <br />.000 ....... 63.00 <br />000 ....... 65.50 <br />000 ....... 68.00 <br />000 ....... 70.50 <br />000 ....... 73.00 <br />000 ....... 75.50 <br />000 ....... 78.00 <br />000 ....... 80.50 <br />000 ....... 83.00 <br />000 ....... 85.50 <br />000 ....... 88.00 <br />000 ....... 90.50 <br />000 ....... 93.00 <br />000 ....... 95.50 <br /> <br />$33 000 ....... 98.00 <br /> <br />34 <br />35 <br />36 <br /> <br /> 37 <br /> 38 <br /> 39 <br /> 40 <br /> 41 <br /> 42 <br /> 43 <br /> 44 <br /> 45 <br /> 46 <br /> 47 <br /> 48 <br /> 49 <br />*50 <br /> <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br />000 ...... <br /> <br />100.50 <br />103.00 <br />105.50 <br />108.00 <br />110.50 <br />113 O0 <br />115 50 <br />118 O0 <br />120 50 <br />123 O0 <br />125 50 <br />128 O0 <br />130 50 <br />133 O0 <br />135 50 <br />138 O0 <br />140 50 <br /> <br />*ALL ABOVE $50,000 WILL BE $1.25 FOR EACH ADDITIONAL $1,000.00. <br /> <br /> 7. The permit fee for unfinished basements and attached garages shall be <br />$17.50 per square foot. <br /> 8. The fee for NEW CONSTRUCTION under $15,000 shall be determined by the <br />fee schedule for ALTERATIONS AND REPAIRS OF BUILDINGS, listed below. <br /> 9. The fees listed below shall apply to all ALTERATIONS AND REPAIRS OF <br />BUILDINGS (including but not limited to reroofing, removal or demolition of <br />buildings or structures, and addition of small accessory buildings: <br /> <br />ESTIMATED COST <br /> <br />1 001 - <br />2 001 - 3 <br />3 001 - 4 <br />4001 - 5 <br />5001 - 6 <br />6001 - 7 <br />7 001 - 8 <br />8 001 - 9 <br />9 001 - 10 <br />10 001 - 11 <br />t1,001 - 12 <br />12 001 - 13 <br />13,001 - 14 <br /> <br />I 000 ............. $ <br />2 000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br />000 .............. <br /> <br />11.00 <br />14.00 <br />17.00 <br />20.00 <br />23.00 <br />26 00 <br />29 O0 <br />32 00 <br />35 00 <br />38 O0 <br />41.00 <br />44.00 <br />47.00 <br />50.00 <br /> <br />14 001 - 15 000 .............. *53.00 <br />*ALL ABOVE $15,000 WILL BE $1.25 FOR EACH ADDITIONAL $1,000.00. <br /> <br /> 10. The insulation permit fee is $12.00 for all residential buildings. <br />For commercial buildings, the fee is determined by the schedule listed above for <br />ALTERATIONS AND REPAIRS OF BUILDINGS. <br /> <br />11. The PLUMBING AND FIRE SPRINKLER permit fees are as follows: <br /> <br />First Fixture ............ $ 6.00 <br />Each Additional Fixture ....... $ 4.00 <br />Water Heater Replacement ...... $ 12.00 <br />Water Service ............ $ 12.00 <br />Sewer Service ............ $ 12.00 <br />Water/Sewer Service ......... $ 15.00 <br />Fire Sprinkler .... $12.00 ..... plus .01 per square ft. <br /> <br /> <br />