My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1990 11 09
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1990
>
BC 1990 11 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:29:16 PM
Creation date
11/27/2017 1:10:18 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
11/9/1990
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
570 <br /> <br />2,0 Airport Layout Plan (ALP) Drawing Set <br /> This task will result in the establishment of the ALP drawing <br />set for the new Cabarrus County Airport. The drawings will be <br />developed in concert with FAA Advisory Circular AC 150/53300-13, <br />Appendix 7, entitled "Airport Layout Plan Components and <br />Preparation". <br /> The following drawings will be produced: <br /> Airport Layout Drawing <br /> · Terminal Area Drawing. <br /> · Runway Protection Zone Drawing <br /> · Airport Airspace Drawing <br /> · Land Use Drawing <br /> · Airport Property Map <br />3,0 Narrative Report <br /> The Narrative Report will document the reasoning behind and <br />important features of the ALP drawing set. The narrative report <br />will contain the following items: <br /> · Intended Operational Role and Background of the New Airport <br /> · Aeronautical Forecast Summary <br /> · Facility Requirements and Design Standards <br /> · Development Schedule, Cost Estimates and Funding Sources <br /> · Land Use Compatibility Plan <br /> · Height Zoning Ordinance and Map <br />4.0 Cost Proposal <br /> Ail work will be accomplished within a fixed fee budget of <br />$26,504.00. The budget breakdown is shown below: <br /> <br />Item <br />ALP Drawing Set <br />Narrative Report <br /> <br />Person Hours* Cost <br /> 310 $16,120.00 <br /> 192 9,984,00 <br /> Subtotal $26,104.00 <br /> Supplies & Expenses 400.00 <br /> <br /> TOTAL $26,504.00 <br />* At an average cost of $52 per hour (includes salary, overhead & fee) <br /> <br />5.0 Project Schedule <br /> As indicated below, all products will be available in draft <br />form within a 2 month period from notice to proceed. One additional <br />month is included for the final review process. <br /> <br />Item <br /> <br />Draft ALP Drawing Set <br />Draft Narrative Report <br />FAA & NCDOT Review <br />Formal ALP Set & Report <br /> <br /> Months <br />1 2 <br /> <br /> There being no further business to come before the Board, Chairman Lentz <br />recessed the meeting until 8:30 A.M. on Wednesday, November 14, 1990. <br /> <br />Clerk to the Board <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.