My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2017 12 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2017
>
AG 2017 12 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 6:11:04 PM
Creation date
3/20/2019 5:20:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/18/2017
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kanna olis Middle School <br />PCO # 001 R2 <br />oatea 04/20/16 <br />Description of Work: Add for corrective work to existing drainage pond per sketch from DMP. See <br />attached from Harvest Environmental (Including detailed breakdown). This PCO does not include a <br />request for added time or related extended general conditions. We reserve the right to revisit this if <br />base contract work cannot be advanced until after remedial work on the existing pond Is complete, <br />REVISED 512/16 <br />Direct Cost of Change <br />DESCRIPTION <br />i.ABOR <br />MAiL EQUIP <br />SUBC <br />TOTAL <br />1 Corrective work - Harvest <br />0 <br />0 <br />0 <br />36,381 <br />35,381 <br />2 Emergency work for riser <br />0 <br />0 <br />0 <br />500 <br />3 Deduct for CMP riser in lieu of aluminum <br />0 <br />0 <br />0 <br />-3,420 <br />-3,420 <br />4 <br />0 <br />0 <br />0 <br />0 <br />0 <br />5 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />7 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 <br />01 <br />0 <br />0 <br />0 <br />0 <br />9 <br />0 <br />0 <br />0 <br />0 <br />0 <br />10 <br />0 <br />0 <br />0 <br />0 <br />0 <br />11 Estimating of Chane <br />20 <br />0 <br />0 <br />0 <br />20 <br />12 Pro ect Management of Change <br />0 <br />0 <br />0 <br />0 <br />0 <br />13 Pro ed _Administrator of Change <br />14 Scheduling of Change <br />0 <br />0 <br />_0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />15 Supervision of Change <br />0 <br />0 <br />0 <br />0 <br />0 <br />16 Expendabie Tool 5% of EFI direct labor <br />0 <br />0 <br />0 <br />0 <br />0 <br />17 Rough Hardware <br />0 <br />0 <br />0 <br />0 <br />0 <br />18 tousekeeping(1% of direct costs 1-10) <br />19 Dumpst 1/2%of direct costs 1-10 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />20 Final Clean <br />0 <br />0 <br />0 <br />0 <br />0 <br />21 Record DraWn O&M <br />0 <br />0 <br />0 <br />0 <br />0 <br />22 Punch Ust <br />0 <br />0 <br />0 <br />0 <br />0 <br />23 <br />0 <br />0 <br />0 <br />0 <br />0 <br />24 Overtime Adjustment <br />0 <br />01 <br />01 <br />0 <br />0 <br />25 Workng Height Adjustment <br />26 Congestion Adjustment <br />27 OutofSequenceA 'ustment <br />01 <br />0 <br />0 <br />0 <br />0 <br />0 <br />20 <br />0 <br />01 <br />0 <br />01 <br />0 <br />0 <br />0 <br />Extended Project Overhead <br />1 SupervislonlTruck/Fuel <br />0 <br />01 <br />0 <br />0 <br />0 <br />2 Gen Su t/Truck/Fuef <br />0 <br />0 <br />0 <br />0 <br />0 <br />3 Project Mgr/Auto/Fuel <br />0 <br />0 <br />0 <br />0 <br />0 <br />4 Field Office/Storage <br />0 <br />0 <br />0 <br />0 <br />0 <br />5 Temp Toilets <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 Temp Utllitos <br />0 <br />0 <br />0 <br />0 <br />0 <br />7 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />SUBTOTALS »> <br />201 <br />0 <br />0 <br />32461 <br />32481 <br />42.00% PAYROLL T &I <br />8 <br />WA <br />WA <br />NIA <br />a <br />7.2s% SALES TAX <br />WA <br />0 <br />0 <br />N/A <br />0 <br />SUBTOTALS <br />1 281 <br />0 <br />0 <br />32461 <br />32489 <br />FEE FOR CONTRACTOR-PERFORMED WORK <br />>>> <br />16.00% <br />4 <br />FEE FORSUB-CONTRACTOR-PERFORMED WORK>>> <br />6.00% <br />1623 <br />SUBTOTAL <br />»> <br />34117 <br />BOND PREMIUM>>> <br />1.00% <br />341 <br />QUOTE >> <br />$34,458 <br />Calender D Time Extension Required <br />>>> <br />0 <br />Pro osal expires In 15 <br />[days. <br />This entire proposal shall become part of arty future Change Order. Edison Foard reserves the right to claim and recover <br />impact costs in rhe event the cumulative total of Change Orders on this project Is so signitacan! to be disruptive and to cause <br />ineflielencies. This proposal Is subject to review and revision if not accepted In writing within the time period stated herein. <br />Attachment number 2 \n <br />F-7 Page 101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.