Laserfiche WebLink
COST OF CHANGE WORKSHEET <br />Harvest Environments <br />Prepared By: Brian Myers <br />Project: Kannapol'es Middle School <br />Architect: Mosley <br />KMS CHANGE ORDER REQUEST <br />Unit Cost <br />COC# 001 <br />ProjeR 0: APN-550128 <br />Date: 4-18-2016 <br />Description OtY <br />Uni[ft'DS,TNS,EA) <br />laborMaterials Subtontr4rtor Equipment <br />labor Material Subcontractor Equipment Taal <br />(21 Operators, (11 Labor, (11 Su r 40 <br />JIRLY <br />$130.0055 <br />20,av I IS5,2D0.00 <br />Erosion CmvIIol matt ng, Sect. Fere 700 <br />SYD <br />54.80 <br />- " Yi s 360'00 <br />Rlp Rap, 575tw.e, Conaere, MBc Mate4al 1 <br />-A <br />$2,7110.00_ <br />/CU <br />Serice Truck 5 <br />DAILY <br />59S.DD <br />S':.'5. 'C .,.$:75,90. <br />Off Road 25 Dump Truck 30 <br />HRLY <br />S1D9.00 <br />_. <br />Komatsu PC22S Excavator 30 <br />HRLY <br />5137.00 <br />Deere6500gzel 30 <br />HRLY <br />$93.00 <br />raaenrz080 vbra:oryclmpaaor 30 <br />HRLY <br />554oD <br />' r62D:90 <br />: l+Y•! <br />Riser I 1 <br />EA <br />$180.00 <br />--T - <br />101d <br />Oplion al Aluminum Riser 1 <br />EA <br />57,6x0 tR1 <br />J 840:00.• <br />SCDPE: <br />fnntraR rs sub<oral_ t{7i:j1�a R S5 �: .!i.J ii0 I -535G0.00; P512765.00. 0Ey535 %5:00. <br />SEEATTCHED FOR SCOPE OFWORK, <br />51004;80, <br />cbangeorder request lsforeidsdng p-cin,taration and riser <br />ieplacem— <br />CoMnRon1otal(on <br />- 536,9.14.80. <br />You will need to ADD the price For the new riser to this tots. <br />10% Niall, up to <br />5 bTotal.(AfterM rR p. taaesJ .3 <br />dA <br />i' 4n $90,x]130, <br />Total Changefioptisal <br />3 3 y,,. <br />By acceptance of this Con of Change, the project duratbn <br />ACCEPTED <br />DATE <br />w10,INCRFASE 0 days, <br /><✓7�9�r1 <br />DECREASE 0 days, <br />REJECTED <br />DATE <br />NOTCHANGE 0 <br />-1--Al <br />- -3v <br />F-7 Page 102 <br />