Laserfiche WebLink
M SELEYAR HITS T <br />11430 North Community House Rood, Gibson 6ulldlno -Suite 225 <br />(704)540.5756 FAXi(704)540-3754 <br />POTENTIAL CHANGE ORDER <br />6/6/2016 <br />Mr. David Pofahl <br />Edison Foard Construction Services Inc <br />3900 Rose Lake Dr. <br />Charlotte, NC 28217 <br />RE: Kannapolis New Middle School - 550128 <br />Potential Change Order No. 002 - DPI revisions <br />Please submit with the form below an itemized material cost and time proposal for the changes in the <br />contract sum and contract time for the following proposed modification(s) to the contract: <br />Description: <br />Reference the attached bulletin drawings and provide the revised work shown. <br />BD1-E1. GFI outlet has been added <br />BD1-E2, GENL1 feeder wire has been revised <br />E6.1. Beakers have been revised <br />BD -P2. Acid waste pipe relocated for coordination of shower above. <br />BD -P3. Provide ES -1 in lieu of EW -1 in biotech D106 <br />BD -P4, BD -P5, BD -P6 & BD -P7, Science classroom water distribution clarification <br />Receipt of your proposal is requested by: 6/20/2016 <br />This is not a change order nor a directive to proceed with the work described herein until accepted by the Owner. <br />Proposal <br />In response to the request above, the Contractor proposes to perform the changes described for an <br />Increase / decrease in the contract sum in the amount of $i 17, ��, bD and increase / <br />decrease in the contract time of �1calendar days. <br />A detailed breakdown of labo rri�d material costs is attached hereto which includes all costs and time <br />associated with the DroDo .h!0cefsh -,,,,4 <br />0 <br />Signed: <br />Steve Nally, Construction Administrator <br />Encl.: As Stated <br />Cc w/encl.: <br />Attachment number 2 \n <br />F-7 Page 116 <br />