My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2017 12 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2017
>
AG 2017 12 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 6:11:04 PM
Creation date
3/20/2019 5:20:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/18/2017
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M SELEYAR HITS T <br />11430 North Community House Rood, Gibson 6ulldlno -Suite 225 <br />(704)540.5756 FAXi(704)540-3754 <br />POTENTIAL CHANGE ORDER <br />6/6/2016 <br />Mr. David Pofahl <br />Edison Foard Construction Services Inc <br />3900 Rose Lake Dr. <br />Charlotte, NC 28217 <br />RE: Kannapolis New Middle School - 550128 <br />Potential Change Order No. 002 - DPI revisions <br />Please submit with the form below an itemized material cost and time proposal for the changes in the <br />contract sum and contract time for the following proposed modification(s) to the contract: <br />Description: <br />Reference the attached bulletin drawings and provide the revised work shown. <br />BD1-E1. GFI outlet has been added <br />BD1-E2, GENL1 feeder wire has been revised <br />E6.1. Beakers have been revised <br />BD -P2. Acid waste pipe relocated for coordination of shower above. <br />BD -P3. Provide ES -1 in lieu of EW -1 in biotech D106 <br />BD -P4, BD -P5, BD -P6 & BD -P7, Science classroom water distribution clarification <br />Receipt of your proposal is requested by: 6/20/2016 <br />This is not a change order nor a directive to proceed with the work described herein until accepted by the Owner. <br />Proposal <br />In response to the request above, the Contractor proposes to perform the changes described for an <br />Increase / decrease in the contract sum in the amount of $i 17, ��, bD and increase / <br />decrease in the contract time of �1calendar days. <br />A detailed breakdown of labo rri�d material costs is attached hereto which includes all costs and time <br />associated with the DroDo .h!0cefsh -,,,,4 <br />0 <br />Signed: <br />Steve Nally, Construction Administrator <br />Encl.: As Stated <br />Cc w/encl.: <br />Attachment number 2 \n <br />F-7 Page 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.