My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2017 12 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2017
>
AG 2017 12 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 6:11:04 PM
Creation date
3/20/2019 5:20:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/18/2017
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDISON FOARD <br />PO Box 19888 <br />Charlotte. NC 28219-0888 <br />Ph: (704)329-8000 <br />RF! <br />To: Paul Bielicki <br />RFI #: 201 <br />Moseley Architects <br />Date: 6/6!2017 <br />11430 North Community House <br />Job: 16-2711 Kannapolis Middle School <br />Road <br />Phone: <br />Charlotte, NC 28277 <br />Ph: 704-540-3755 Fax: 704-540-3754 <br />CC: <br />Subject: Roof System RFA2 <br />Drawing: A10.2 Spec Section: 074113 <br />Cost Impact: TBD Schedule Impact: TBD <br />Request: Date Required: 8/912017 <br />Please clarify the roof assembly RFA2. Sections through locations where RFA2 are located direct you to details 8, 11, and 12 on <br />A5.22; those details do not indicate the materials that make up roof assembly RFA2. Furthermore. when refering to the spec section <br />for standing seam roof panels, which is the finish for RFA2; insulation, underlayment, vapor barrier. and substrate board are <br />referenced or defined. <br />Please indicate In the documents where the components making up RFA2 are called out <br />Requested by: Jerry Anderson <br />Edison Foard Inc <br />Response: <br />To confirm, the system <br />beneath the standing <br />The components for RFA2 are indicated on A10.1 seam panels will equal <br />5.5", sames as that in <br />the majority of the TPO <br />6/ 14/2017 areas. <br />Further clarification - the components for the Insulation, <br />vapor barrier, and substrate board are equivalent to those <br />components in the membrane roofing assembly and can be <br />found in that specification section. <br />Paul Bielicki <br />Answered by <br />Moseley Architects 6/12/2017 <br />Company Date <br />At�A%InKrriber 3 \n <br />F-7 Page 172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.