Laserfiche WebLink
0 imagination at work <br />Name: KANNAPOLIS MIDDLE SCHOOL Date: 06/10/2016 <br />Quote #: S080B37 <br />2. GE will assume the risk of loss or damage to the destination for a 20% adder (but not less than $500 net) applied to the <br />total price of the equipment. "Destination" is defined as GE's common carrier's delivery point nearest first destination or <br />point of export within the continental U.S. <br />3. Unless otherwise noted in this quotation, normal transportation and handling, is allowed on orders of $500 net or more <br />to common -carrier point nearest destination within the Continental US (excluding Alaska and Hawaii). For orders <br />below $500 net, a $50 handling charge will be added to the Invoice. The $50 handling charge Is waived for premium <br />freight paid by the customer or ex -works orders picked up by the customer at Seller's facility. <br />4. Shipment via Air or Open -Top/Flatbed/Lift gate truck not Included unless specifically listed herein. <br />5. Special Instruction - The Receiving Associate is required to sign, date and note specific visible or concealed damage on <br />BIII of Lading at time of delivery. Freight Company Associate is required to witness Receiver's signature, date and <br />damage claim annotations. GE's Post Sales Service Department must be provided with copy of annotated BOL within <br />five (5) days of delivery or Shipper's responsibility ends. <br />The lead-times quoted are for Estimating Purposes Only. Actual drawing and shipping schedules will be based on factory <br />load, receipt of order with complete technical information, and the date GE receives authorized release to manufacture. <br />The accompanying Bill of Material is our Interpretation of what Is required to meet the intent of the listed Drawings and <br />Specifications. Please review thoroughly for accuracy and completeness, and advise immediately if any revisions are required. <br />This proposal Is limited to the attached Bill of Material only. Start-up Services and Training are not Included unless specifically <br />noted herein. Changes to scope will require a revised proposal. <br />The devices listed on this bill of material may have selective coordination over the long time, short time and Instantaneous <br />range. GE's selective capabilities are listed in publication DET -537. It Is recommended that a qualified engineer be employed to <br />determine selective coordination as required for the project and in accordance with applicable local codes and acceptable <br />engineering practices. Selective coordination may require significant changes to the system design, equipment sizing and cost. <br />DOE 2016 Transformer Notice: <br />On January 1, 2016, LV Dry Type transformers must meet a higher energy efficiency standard (DOE 2016). <br />Beginning January 1, 2016 the GE factory will no longer manufacture TP -1 energy efficient transformers for US markets. <br />Shipment of stock TP -1 transformers from our warehouse after December 1, 2015 is subject to availability. <br />If your non -stock transformer(s) will have a ship date after January 1, 2016, GE strongly recommends that you quote the <br />new DOE 2016 design. <br />Although Speedi allows quoting of DOE 2016 transformers today, GE will not begin taking orders for DOE 2016 <br />transformers until November 16, 2015. <br />For more information on this important change, visit www.gelndustrial.com/transformers <br />GE Proprietary Information <br />The information contained in this document is GE Proprietary Information and is disclosed in confidence. It Is the <br />property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE. <br />Phillip Windham <br />Attachment number 2 \n <br />Page: 5 <br />F-7 Page 127 <br />