Laserfiche WebLink
COST OF CHANGE WORKSHEET <br />Harvest Environmental <br />Prepared By: Imad Mohammed <br />Project: KMS <br />Architect: <br />Unitfost <br />COC# Tennis Court Undercut <br />Project f! <br />Date: 7127/17 <br />Description <br />Qty <br />Unit(YDSTNS,EA) <br />Labor Materials Subcontractor <br />Equipment <br />Labor <br />Material <br />Subcontractor Equipment <br />Total <br />Tennis Court Undercut per ECS <br />Foreman <br />8 <br />HRS <br />$65.00 <br />$520.00 <br />$520.00 <br />Laborer <br />10 <br />HRS <br />$30.00 <br />$300.00 <br />$300.00 <br />Operator p <br />15 <br />HRS <br />$40.00 <br />$600.00 <br />$600.00 <br />Hitachi 350 Excavator <br />10 <br />HR5 <br />$155,66 <br />$1,556.60 <br />$1,556.60 <br />Dirt Export <br />579 <br />YDS <br />$2.60— <br />1,158.00 <br />$11158.00 <br />Dump Trucks <br />52.5 <br />HRS. <br />$90.00 <br />4,725.00 <br />$4,725.00 <br />290 Excavator <br />HRS <br />$129.S6- <br />Motor Grader <br />HRS <br />.$70.87 <br />Case Roller 206 <br />6 <br />HRS <br />$44.01 <br />f$264.06 <br />264.06 <br />JD -650 Dozer <br />10 <br />HRS <br />.$69.80 <br />698.00 <br />698.00 <br />Geognd <br />3 <br />ROL <br />$1,000.00 <br />$3,000.00 <br />3,000.00 <br />ABC <br />1004.11 <br />$27.00 <br />27,110.97 <br />$27,110.97 <br />SCOPE! <br />Per ECS report, Harvest performed undercut at tennis court area. This undercut <br />was brought back up with stone Instead of dirt which Is reflected in the above <br />quantities. <br />Contractors Subtotal <br />Sales Tax <br />Contractors Total Cost <br />OH&P <br />Subtotal <br />Total Change Proposal Cost <br />10% <br />$1,420.00 $31,268.97 <br />$7,243.fi6 <br />$39,932.63 <br />$39,932.63 <br />$3,993.26 <br />$43 925.89 <br />$43,925.89 <br />By acceptance of this Cost of Change, the project duration <br />Will, INCREASE days, <br />DECREASE days, <br />NOTCHANGE <br />ACCEPTED <br />REJECTED <br />DATE <br />DATE <br />Attachment number 3\n <br />F-7 Page 176 <br />