My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2018 03 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2018
>
AG 2018 03 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 1:29:38 PM
Creation date
5/1/2019 2:44:23 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/19/2018
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CABARRUS COUNTY Cabarrus County, North Carolina <br />aer.�.,r mwrsm�. New Courthouse and Renovations to the S I I L I N G <br />Current Cabarrus County Courthouse <br />AIA Document B202— 2009 Standard Form Architects Services: Programming <br />users, stakeholders, etc. to validate the space needs indicated in the Cabarrus County Courthouse <br />Space Needs document dated December 15, 2016. Upon County approval of the final space needs <br />requirements the Architect will integrate the requirements in Test Fit Studies as indicated in the <br />following section. <br />Attachment A <br />12. Test Fit Studies <br />The Architect will develop graphic Test Fit Studies in the form of two and three-dimensional digital <br />drawings and computer modeling representing the initial concepts of site utilization, building <br />orientation, departmental vertical stacking and diagrammatic block diagram level department layout <br />of each floor. The Architect will conduct the Test Fit Studies review with the County and modify the <br />concepts in accordance with the County's review comments. It is anticipated that the Test Fit Studies <br />will be used in initial reviews with the City of Concord to develop preliminary development consensus. <br />13. Opinion of Probable Project Cost <br />The Architect will develop a Program Level Opinion of Probable Project Cost based on the detailed <br />content of the CABARRUS COUNTY COURTHOUSE BUILDING PROGRAM to include the following: <br />a. Site Development Cost <br />b. Courthouse Renovation Cost <br />c. New Courthouse Construction Cost <br />d. Construction Contingency <br />e. Commissioning <br />f. A/E Design Fee <br />g. Furniture, Furnishings and Equipment <br />In. Owners Administrative Costs <br />I. Project Contingency <br />14. CABARRUS COUNTY COURTHOUSE BUILDING PROGRAM Deliverables <br />a. Statement of Goals/Objectives <br />b. Site Analysis <br />c. Revised Space Needs <br />d. Adjacency Diagrams and Building Stacking <br />e. Building Systems Narrative <br />f. Energy Performance Narrative <br />g. Room Data Sheets <br />In. Courtroom Diagrams/Courtroom Modeling <br />I. Security Narrative <br />j. Expansion Strategies — Narrative and/or Diagrams <br />k. Test Fit Studies <br />I. Phasing—Narratives and/or Diagrams <br />m. Programming Level Opinion of Probable Project Costs <br />Attachment number 3 \n <br />F-12 Page 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.