My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2018 03 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2018
>
AG 2018 03 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 1:29:38 PM
Creation date
5/1/2019 2:44:23 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/19/2018
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNC <br />�Y SCHOOL OF GOVERNMENT <br />bid. There is no limitation on the dollar amount of change order work, but use of <br />change orders should be limited to circumstances that were unforeseen when the <br />contract was awarded. [G.S. 143-129(e)(4)] <br />3. Emergencies — Construction and repair work arising from situations involving public <br />health and safety is exempt from competitive bidding requirements. Use of this <br />exception should be limited to situations involving an imminent or immediate threat to <br />public health and safety; the exception is not allowed if the local government can <br />comply with competitive bidding requirements without exacerbating the threat to <br />public health and safety or damage to property.22 [G.S. 143-129(e)(2)] <br />4. Guaranteed Energy Savings Contracts (GESC) — A GESC is a contracting and financing <br />method for the repair or upgrade of existing buildings (not new construction) that <br />involve energy-saving improvements where the total cost of the contract is paid forwith <br />the energy savings, and the contractor guarantees the amount of energy savings over <br />the life of the contract. A special RFP process is required for advertising, evaluating, and <br />awarding a GESC. [G.S. 143-64.17, -64.17A, -674.178; G.S. 143-129(e)(8)] <br />5. Solid Waste Management and Sludge Management Facilities — In lieu of competitive <br />bidding procedures, a special RFP process may be used for the design, operation, and <br />construction of solid waste and sludge management facilities. [G.S. 143-129.2] <br />V. Resources <br />Websites and Manuals: <br />3 School of Government Local Government Purchasing and Contracting website <br />3 School of Government Coates' Canons: NC Local Government Law Blog <br />3 State Construction Office Guidelines <br />3 Department of State Treasurer Purchasing and Contracting Checklist <br />3 Department of State Treasurer Policy Manual for Local Governments, Section 35: <br />Purchasing and Contracting Manual <br />3 NC Office for Historically Underutilized Businesses Certification Program <br />3 NC Office for Historically Underutilized Businesses Statewide Uniform Certification <br />Procedures Manual <br />Publications: <br />3 Fleming Bell, II, Construction Contracts with North Carolina Local Governments, 4`b ed. <br />(2007) <br />3 Bluestein, Frayda, A Legal Guide to Purchasing and Contracting for North Carolina Local <br />Governments, 2M ed. (2004), with 2007 supplement. <br />v Raynor v. Town of Louisburg, 220 N.C. 348, 17 S.E.2d 495(1941); Houston, Norma, "When is an Emergency <br />Really an Emergency?" Coates Canons blog post, UNC School of Government, June 7, 2011. <br />miter 1 \n <br />16 1 Construction Contracting Basic Legal Requirements updated September 2013 <br />F-9 Page 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.