My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2018 05 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2018
>
AG 2018 05 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 4:07:59 PM
Creation date
5/1/2019 6:14:37 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/21/2018
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AT Cabarrus <br />A County Schools <br />�r Erere�aminax.GnyreluNres <br />April 25, 2018 <br />The Honorable <br />Mr. Steve Morris, Chair <br />Ms. Diane Honeycutt, Vice Chair <br />Ms. Liz Poole <br />Mr. Lynn Shue <br />Mr. Blake Kiger <br />Cabarrus County Board of Commissioners <br />65 Church Street, SE <br />Concord, NC 28026 <br />Re: Request to reclassify funds in PLC project <br />Dear Board of Commissioners: <br />On April 16, 2018 the Cabarrus County Board of Education voted unanimously to allow staff to request a <br />transfer of funds in the PLC project. The BOE is not requesting additional funds, just a reclassification of <br />currently budgeted funds. <br />Below, you will find the explanation for the request that was provided to the BOE <br />We have been working closely with our design team of Liles Construction Company, Inc. and <br />Morris -Berg Architects for the past 6 months on the programming and design development of <br />the new PLC facility. Over the last couple of months as we finalized the design, the team began <br />working through the final budgeting of the project and solidifying their construction team. <br />To recap the monies allocated for this project, we had a construction budget of $3,080,291.00 for <br />the design, site development and construction of the building. Outside of the this we have <br />additional approved funding for FEE, technology, engineering and administration fees. The final <br />construction estimate provided is approximately $20,000.00 higher than the original budget. We <br />have worked on value engineering this project in hopes of getting closer to our target price but at <br />this point any more VE done would jeopardize the look and end result of this project which we <br />do not want to have happen. <br />We are also working through the FF&E for the project and after initial estimate realize that the <br />funded amount will not meet the needs of the school. Our budget for this school is $131,709.00 <br />but initial estimates have the FF&E package coming injust over $200,000.00. We would request <br />that an additional $60,000.00 be added to our FF&E budget to help offset the additional cost. <br />We are working to value engineer the furniture package but again, we do not want to jeopardize <br />the product we are providing to students and staff. <br />As a part of our Soft Cost Funding, we also included a separate line for `Architect' in the amount <br />of $100,000.00. This money was allocated on the original budget as a kind of safety net for the <br />project on the chance that we were not satisfied or confident with the direction the design firm <br />Alizchmenl number t \n <br />G-1 Page 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.