Laserfiche WebLink
selected was taking which is not the case. The Design -Build delivery method does not provide us <br />the control we typically have over which architectural firm is chosen. There was also the <br />question of Construction Administration (CA) that is typically handled by our design <br />consultants. Again, with a Design -Build delivery method, this would not have been provided <br />since the architectural firm is contracted tinder the general contractor and not the school system. <br />Between myself and Executive Director of Operations Tim Lowder, we have a combined 55 <br />years' experience in the construction industry and are more than capable of providing the <br />necessary CA required for this project. This along with the fact that we are working with two <br />firms that have a long history with Cabarrus County Schools is why we feel we will not require <br />the use of this money. <br />With that said, we would like to request from Cabarrus County Commissioners that we be <br />allowed to reallocate $80,000.00 from the architectural account to help offset these additional <br />expenses. The $20,000.00 would be moved into the Construction Account and $60,000.00 would <br />be moved into the FF&E Account. If the commissioners are agreeable, we will do a budget <br />amendment to the existing purchase order. <br />The request is highlighted in green, below. <br />ew RC LerYBPJnIn <br />U,ODO 00 <br />N[w M -M tw <br />(Bg000.00j <br />m(9[0[ <br />IOg000 <br />Hew pLC 4mtl Mqublllon (9p1( <br />Mind <br />n <br />R[ -f8[ <br />Ilym9.00 W.000.00 <br />New NG-[prl Vp Suppllet <br />gOW.OV <br />NenPW �leNnolryy <br />mg000 eo <br />m..eNmNapin�.,t,�rc�re <br />maooa.aa <br />vtc-m�ww�w <br />Iwom.po <br />K,61y H.OIuttZ1Finciliefana, C <br />Officer <br />Cabarms County Schools <br />R[[6l[ <br />tn9ao - MM100 <br />rym[0o <br />m,om.ao <br />[xom.ao <br />Atuchmenl number I \n <br />G-1 Page 130 <br />