Laserfiche WebLink
Quality Control Program <br />Third Party Contracting Guidance (FTA C 42201 F) <br />All third party contractors must be in compliance with all applicable Federal and State laws, regulations, and <br />directives, except to the extent that the Department determines otherwise in writing. <br />Bidders agree to comply with the following Federal and State administrative requirements: <br />1) U.S. DOT regulations, Uniform Administrative Requirements for Grants and Cooperative Agreements to <br />State and Local Governments 49 C.F.R. Part 18. <br />2) Title 19A North Carolina Administrative Code (N.C.A.C.) Subchapter 5B. See Addendum A. <br />3) To achieve compliance with changing federal requirements, the bidder makes note that federal, state, <br />and local, requirements may change and the changed requirements will apply to this contract as <br />required. <br />4) Bidder will be performing activities for CCTS, as such the bidder agrees to abide by the Grant <br />Agreement or the FTA Master Agreement and extend those requirements throughout each tier of their <br />organization. <br />The contractor shall institute and maintain a complete quality -control program to ensure that the requirements of <br />this contract are provided, as specified. The overall goal of the program should be to identify and correct any <br />problems that may exist before they are identified by or reported to the CCTS and/or the vehicle maintenance <br />staff. As a minimum, the program shall include: <br />An inspection system covering all the services required with a comprehensive checklist to be used to inspect <br />contract performance during scheduled and unscheduled inspections, and the name(s) of the individuals who <br />will be performing the inspections. <br />A system for identifying and correcting deficiencies and/or a pattern of deficiencies in the quality or quantity of <br />services provided before the level of performance becomes unacceptable and/or CCTS point out the <br />deficiencies. <br />A file of all inspections conducted by the Contractor and corrective actions taken must be maintained. This <br />should include follow-up inspections to ensure that corrective action was appropriate, complete, and timely. <br />This documentation shall be organized in a logical manner, kept current, and made available to CCTS during the <br />term of the contract. <br />Quality Assurance <br />CCTS shall evaluate the contractor's performance under this contract. All surveillance observations shall be <br />recorded by CCTS. When an observation indicates defective performance, CCTS shall request the contractor's <br />representative to initial the observation. All observations of incomplete or defective performance, or safety and <br />health standards violated shall be recorded. <br />CCTS verification inspections of services shall not constitute acceptance, nor replace the contractor inspection <br />or in any way relieve the contractor of any responsibility to take all actions necessary to assure highest quality <br />of service rendered - <br />The contractor may be required to meet with CCTS as often as necessary as determined by the CCTS <br />14 <br />Atl chmenl number 1 In <br />F-3 Page 132 <br />