Laserfiche WebLink
4. TRANSMISSION ENGINEERING SERVICES <br />Motorola will undertake the responsibilities assigned to them. <br />M 1 MotorolaResponsibility <br />C <br />Customer Responsibility <br />Cu <br />NAI <br />Not Applicable <br />Providing preliminary path profiles, path calculations and availability calculations; <br />X <br />4.1 PATH FEASIBILITY STUDIES <br />4.1.1 Feasibility studies are prepared using preliminary and unverified information <br />provided by the Cabarrus County or other sources. Feasibility studies are prepared <br />by Motorola in order to form the baseline equipment and radio frequency system <br />design and budgetary estimates. Feasibility studies include the following <br />responsibilities: <br />east <br />Providing system topology maps; <br />X <br />Providing preliminary path profiles, path calculations and availability calculations; <br />X <br />Providing a technical report summarizing system design considerations and <br />Equipment requirements. <br />X <br />Latitude and Longitude of the proposed microwave sites <br />X <br />Existing tower heights if known <br />X <br />4.1.2 Feasibility studies provide preliminary assumptions and are not intended to be final <br />designs. <br />4.2 PATH SURVEYS <br />13-" qust2M3 <br />® Motivate Solutions Confidential FtesNcted <br />Use or dbcbsure of this proposal's subject <br />to the re9rictims on the cover page. <br />Table of Contents v <br />F-9 Page 200 <br />