Laserfiche WebLink
4.2.1 Formal microwave path surveys are recommended to determine or verify site <br />coordinates, ground elevation, on -path obstructions (location and height), tower <br />information, and other parameters required to engineer the final design of a radio <br />link The present and anticipated future effect of on -path obstructions, such as <br />tree growth, is evaluated and incorporated into the path design where applicable. <br />Microwave path surveys include the following responsibilities: <br />4.2.2 Geodetic coordinates should be accurate to within 1 -second of latitude and (- <br />second of longitude. Ground elevations are accurate to within 5 -feet and that on - <br />path obstructions at critical points are identified and present heights are accurate <br />to within 5 -feet. <br />4.3 SITE SURVEYS <br />Site Surveys <br />Deteanine and document locations fornew equipment rack at each site. <br />M <br />X <br />Provide documents relating to previous path calculations and frequency <br />coordination; <br />X <br />Provide information to the surveyors to locate the proposed microwave sites <br />X X <br />Arrange for surveyor access to the proposed microwave sites <br />X X <br />Verify site elevations above sea level; <br />X <br />Verify site longitude and latitude: <br />X <br />Provide existing tower description and information; <br />X <br />Provide general survey observations, comments and site photographs; <br />X <br />Provide site layouts including towers with antennas at proposed center lines. <br />X <br />4.2.2 Geodetic coordinates should be accurate to within 1 -second of latitude and (- <br />second of longitude. Ground elevations are accurate to within 5 -feet and that on - <br />path obstructions at critical points are identified and present heights are accurate <br />to within 5 -feet. <br />4.3 SITE SURVEYS <br />Site Surveys <br />Deteanine and document locations fornew equipment rack at each site. <br />M <br />X <br />C <br />N <br />Determine, measure, and document DC power interface locations and cable routes. <br />X <br />Determine, measure, and document Ethernet and T l interface locations and cable routes. <br />X <br />Complete facility drawings, Floor plans, cable running sheets and wall elevations relative <br />to the new Equipment. <br />X <br />Provide info on any environmental alarms that are required to monitor <br />X <br />Determine, measure, and document cable routes from the equipment rack to the customer <br />provided 66 block <br />X <br />Engineer and document fuse any AC breaker types, sizes and assignments. <br />X <br />Complete outside plant general survey and document <br />X <br />Prepare Customer Survey documentation and Installation Specification. <br />X <br />Use ordiscimure of this proposal Is subject <br />M the restrictions on the "anon rover page. <br />6 Table of Contents <br />Resincted <br />Customer Name Long <br />Motorola Solutions Confidential <br />F-9 Page 201 <br />