Laserfiche WebLink
7 Installation and Testing Services <br />Motorola and Cabarrus County will undertake the responsibilities assigned to <br />them, respectively, in this Section 7. <br />7.1 ANTENNA & WAVEGUIDE SYSTEMS INSTALLATION <br />Antenna Ide Systems Installation <br />M <br />Antennas, waveguidc and mounting Equipment delivered to site and inventoried. <br />X <br />in general vicinity of final Equipment location. <br />Assemble antennas, rig towers and de -rig towers upon completion. <br />X <br />Install new radio in existing rack or install new radio in new rack Bolt rack to floor and <br />X <br />Provide and install standard leg pipe mounts. <br />X <br />install rack top support. It is assumed the customer will provide all cable ladders to run <br />Provide and install steel support members for side braces as required. <br />X <br />cable waveguide and top support to the radio rack <br />Provide and install ice shields. <br />X <br />Complete power connections at radio location and circuit breaker within 50 feet of radio <br />X <br />Penetrate building wall or roof for waveguide entry ports and install entry plates as <br />required. <br />X <br />locations. <br />Install antennas and radomes at centerlines per final path design. Waveguide lengths <br />additional waveguide and labor, if required per the final design will result in additional <br />charges. <br />X <br />Complete radio ground connection to station ground ring or bus bar within 50 feet of <br />X <br />Install waveguide runs, hanger kits and ground kits in accordance with manufacturer's <br />specifications. <br />X <br />radio location. <br />Terminate waveguide runs within two feet of proposed radio location. <br />X <br />Complete radio / waveguide interface connection. <br />X <br />Perform antenna and waveguide sweep tests to confirm compliance with manufacturer's <br />specifications. <br />X <br />Install DSl cabling between radio and the DSX patch panel <br />X <br />Install pressurization system equipment and calibrate. <br />X <br />Power on radio, warm up and provision. <br />X <br />Perform antenna alignment. Performance objectives of path will be set to performance <br />calculation sheets. <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documented in this SOW in <br />X <br />7.2 MICROWAVE RADIO INSTALLATION <br />1"OvArprMalo bustantion <br />M <br />Radio and antenna equipment delivered to site and inventoried. Uncrate radio and locate <br />X <br />in general vicinity of final Equipment location. <br />Install new radio in existing rack or install new radio in new rack Bolt rack to floor and <br />X <br />install rack top support. It is assumed the customer will provide all cable ladders to run <br />cable waveguide and top support to the radio rack <br />Complete power connections at radio location and circuit breaker within 50 feet of radio <br />X <br />locations. <br />Complete radio ground connection to station ground ring or bus bar within 50 feet of <br />X <br />radio location. <br />Complete radio / waveguide interface connection. <br />X <br />Install DSl cabling between radio and the DSX patch panel <br />X <br />Power on radio, warm up and provision. <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documented in this SOW in <br />X <br />accordance with the instructions contained in the applicable radio instruction books: <br />13'"Au9ustMl8 <br />® Motorola Solutions Confidential Restricted <br />Una or dsckai.. of this proposal's subject <br />to the re9ricums on the cover page. <br />iabb o/ contents An <br />F-9 Page 208 <br />