My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2018 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2018
>
AG 2018 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 7:18:45 PM
Creation date
5/2/2019 12:14:31 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/17/2018
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3 MPLS EQUIPMENT INSTALLATION <br />Label equipment and cables per required Customer requirements and technical practices. <br />X <br />Install and test DSX cross connect panels. <br />Perform basic power -up and green light testing of in -scope system equipment purchased <br />prior to integration. <br />X <br />Complete cabling from the radio to the customer provided 66 block for any <br />environmental alarms to be monitored <br />X <br />Download the configuration files <br />X <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documented in Appendix Four in <br />accordance with the instructions contained in the applicable instruction manuals. <br />X <br />7.4 ANCILLARY EQUIPMENT INSTALLATION <br />Install and test DC power system & batteries <br />X <br />Install and test DSX cross connect panels. <br />X <br />X <br />Complete cabling from the radio to the customer provided 66 block for any <br />environmental alarms to be monitored <br />X <br />Complete alarm wiring from the 66 block to any ancillary equipment to be monitored <br />over the microwave <br />X <br />7.5 NFM-P INSTALLATION <br />Verify all network elements are discovered by the NFM-P. <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documcntcd in Appcndix Four in <br />accordance with the instmctions contained in the applicable instruction manuals. <br />X <br />Use or disclosure of this proposal Is subject <br />to the restrlohom on the section cover page. <br />14 Tabs, of Contents <br />Realacted <br />Customer Name Long <br />Motorola Solutions Confidential <br />F-9 Page 209 <br />
The URL can be used to link to this page
Your browser does not support the video tag.