Laserfiche WebLink
7.3 MPLS EQUIPMENT INSTALLATION <br />Label equipment and cables per required Customer requirements and technical practices. <br />X <br />Install and test DSX cross connect panels. <br />Perform basic power -up and green light testing of in -scope system equipment purchased <br />prior to integration. <br />X <br />Complete cabling from the radio to the customer provided 66 block for any <br />environmental alarms to be monitored <br />X <br />Download the configuration files <br />X <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documented in Appendix Four in <br />accordance with the instructions contained in the applicable instruction manuals. <br />X <br />7.4 ANCILLARY EQUIPMENT INSTALLATION <br />Install and test DC power system & batteries <br />X <br />Install and test DSX cross connect panels. <br />X <br />X <br />Complete cabling from the radio to the customer provided 66 block for any <br />environmental alarms to be monitored <br />X <br />Complete alarm wiring from the 66 block to any ancillary equipment to be monitored <br />over the microwave <br />X <br />7.5 NFM-P INSTALLATION <br />Verify all network elements are discovered by the NFM-P. <br />X <br />Conduct and record the Acceptance Test Plan (ATP) as documcntcd in Appcndix Four in <br />accordance with the instmctions contained in the applicable instruction manuals. <br />X <br />Use or disclosure of this proposal Is subject <br />to the restrlohom on the section cover page. <br />14 Tabs, of Contents <br />Realacted <br />Customer Name Long <br />Motorola Solutions Confidential <br />F-9 Page 209 <br />