My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Approved March 30, 2022 Meeting Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2020
>
Approved March 30, 2022 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 3:23:10 PM
Creation date
7/15/2022 3:22:34 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
3/30/2022
Board
Parks
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/6/2020 Connie emailed Martha and me and asked if we had received a survey from Chad <br /> Byrd/Sam King. We had not. <br />11/10/2020 Chad Byrd sent an email/survey locating the barn and property lines <br /> <br />11/23/20 Spoke with Sam King around 11/23 about my concerns with the placement of the barn. <br /> At that time, he indicated that he did not realize that the stream was a perennial and he <br /> felt certain that the barn is within the Water Body Buffer. He later sent me his survey <br /> map. Staff then followed up with our own mapping of the WBB and discovered that the <br /> barn was within the WBB. <br />12/2/2020 I received a voicemail from Connie asking about the stream and I sent an email showing <br /> her a snapshot of the USGS maps, which classify the stream as a perennial. <br />12/10-2020 Sent detailed email to Susie with all the exhibits, maps, applications, etc. for the case <br />1/4/2021 Further research shows that an encroachment into the WBB exists and that the location <br /> of the building will need to be shifted <br />1/5/2021 I called Connie to let her know the barn is in violation and would need to be moved <br />1/6/2021 Received a voicemail from Connie about a letter/NOV and responded to her via <br /> email <br />1/14/21 Warning letter was sent via regular mail and certified <br />1/26/21 <br />Site inspection was made <br />It seems that property owner has now placed two more buildings on the property without <br />permits. They also look to be in the waterbody buffer <br />There also seems to be an RV placed in the waterbody buffer <br />2/9/2021 Applicant requested an appeal form <br />3/1/2021 Site inspection was made, more pictures taken <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.