Laserfiche WebLink
cii6e <br />NORTHW OODS' <br />Statement of Work <br />Mobile Solution Project, Children Services <br />end -to -end system to verify all system functional and performance requirements. This stage of testing <br />includes the execution of a comprehensive set of functional and operational tests. <br />During system testing, the traceability of functional requirements demonstrates the realization of user <br />requirements into the delivered product. Test cases form the basis for functional testing. Each test case <br />is linked to at least one functional requirement. As the test cases are executed, the results are recorded <br />and analyzed to address: <br />• Compatibility of all system components within the operating environment. <br />• End -to -end verification across all subsystems. <br />• Reliability and usability of the subsystem interfaces. <br />• Integrity of system design using "real" test data, users and procedures. <br />• System ability to perform in operational scenarios. <br />The execution of each test case results in a pass or fail outcome. All functional requirements related to a <br />test case are considered satisfied upon successful execution of a particular test case. As test cases are <br />executed, defects are recorded, reviewed, clarified, investigated, and confirmed by the test engineer. <br />Once defects have been confirmed, they are categorized for severity as follows: <br />High Critical Absence of this feature or system function will degrade system capabilities. <br />Medium Important Absence of this feature or system function will impair operational <br />effectiveness. <br />Low Desirable Absence of this feature or system function will have little or no impact on <br />efficiency. <br />Release to Production criteria includes the completion of System Testing with the following results: <br />• Each functional requirement is linked to at least one test case. <br />• All test cases have been executed with a pass /fail result. <br />• All high priority (critical) and medium priority (important) functional requirements have passed <br />System Testing. <br />Following Release to Production, configuration settings are baselined and placed under Configuration <br />Management. Subsequent changes are strictly controlled and subject to Change Management. <br />Project Acceptance — The following acceptance criteria are used to acknowledge acceptance of the final <br />project deliverable: <br />• Release to Production criteria has been achieved. <br />• All project work requirements have been completed. <br />• All project deliverables have been accepted. <br />Revolutionizing the Delivery of Human Services° Page 9 <br />Attachment number 1 <br />F -8 Page 144 <br />