My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 03 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 03 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:42:50 PM
Creation date
11/27/2017 11:08:12 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/19/2012
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F <br />Turner <br />CABARRUS COUNTY SHERIFF'S DEPARTMENT <br />AMENDMENT # 5 TO THE GMP — 6 T & 7Tx FLOOR ALTERATIONS <br />CLARIFICATIONS & ASSUMPTIONS <br />e) During the walkthrough, both the architect and Turner will prepare a written <br />punch list. As each area is completed, both representatives will review the <br />notes together, to insure that all items are included and agreed upon. <br />Immediately after the walkthrough is completed, one master copy of the <br />punch list will be given to the owner, architect, end user, and Turner. Each <br />copy will be signed and dated by all parties. Turner will have the punch list <br />typed and distributed. <br />f) The punch list will be broken down at a minimum, in this manner: <br />1) Floor <br />2) Room # <br />3) Wall (with plan north reference & dimension off of corner) <br />4) Ceiling & floor (with plan north reference & dimension off of corner) <br />5) Detailed description of deficiency <br />6) Trades responsible for correction <br />Exclusions: <br />1) Removal and disposal of contaminated /hazardous waste materials and its <br />remediation procedures. <br />2) Removal or rework of hidden or unforeseen items encountered on site. <br />3) All permits, including building permits. <br />4) Commissioning of mechanical and electrical equipment. Traditional startup by the <br />subcontractors has been included. <br />SITEWORK <br />(Not Used) <br />UPERSTRUCTURE <br />(Not Used) <br />EXTERIOR ENCLOSURE <br />(Not Used) <br />Exhibit — Clarifications & Assumptions <br />Page 11 of 24 3 of 6 Attachment number 1 <br />F -3 MaF ,,qth, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.