My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 01 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 01 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:44:42 PM
Creation date
11/27/2017 11:13:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/18/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Construction contingency funds allow the project to cover unanticipated construction costs, <br />often resulting from unexpected conditions encountered during construction. Construction <br />contingency funds are not intended to be used for work that is not construction (e.g., design or <br />construction administration) nor for construction that is not part of the project scope of work <br />(e.g., add -on work). Construction contingency funds may be disbursed only after the Grant <br />Recipient has demonstrated to the Fund that it has expended 100 percent of funds in <br />Construction line items, 100 percent of local matching funds, and at least 90 percent of all other <br />matching funds, including matching grant and/or loan funds. <br />Cabarrus Soil and Water Conservation District <br />CWMTF 2010 -703; Cox Mill School Stormwater BMPs <br />15 <br />ANtn"number 1 <br />F -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.