My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 07 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 07 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 9:53:28 AM
Creation date
11/27/2017 11:25:56 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/8/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br />BASIS OF COMPENSATION <br />1. Basic Services. The OWNER shall pay the CONSULTANT for services set forth in Attachment A, <br />Scope of Services, as follows: <br />Research and Analysis <br />Fngineering/LA - $14,790 Lump Sum <br />Environmental $ 5,764 Cost Hourly <br />Reimbursables $ 750 NTE <br />Conceptual Master Planning <br />Engineerng/LA $25,950 Lump Sum <br />Architecture $ 9,750 Cost <br />Environmental $ 6,760 Cost Hourly <br />Reimbursables $ 900 NTE <br />Preliminary Master Planning <br />Engineering/lA $21,020 Lump Sum <br />-Architecture $16,200 Cost <br />Geotechnical $ 5,000 Cast <br />Reimbursables $ 900 NTE <br />Final Master Planning <br />Engineering/IA $13,290 Lump Sum <br />Architecture $ 8,250 Cost <br />Environmental $ 4,440 Cost Hourly <br />Reimbursables $ 400 NTE <br />FundingAssisfance & Coordination $28,000 Hourly <br />Preliminary Design <br />Engineering/LA $39,510 Lump Sum <br />Ceofechnical $ 5,000 Cost <br />Reimbursables $ 1,000 NTE <br />Design Development $To Be Determined <br />Construction Documents $To Be Determined <br />Bidding $To Be Determined <br />Construction Administrafion $To Be Determined <br />A percentage of the Lump Sum Fee will be billed on the last day of each month. The percentage billed <br />will be the percentage of work estimated to be completed as of the day of billing. <br />s-~ <br />G-9 <br />CaA~ffac~men~ n~kber 3 <br />Page 541 of 627 <br />
The URL can be used to link to this page
Your browser does not support the video tag.