My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 12 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 12 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 3:10:17 PM
Creation date
11/27/2017 11:29:45 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[] <br />the State of North Carolina. It is assumed that a suitable property survey meeting the <br />requirements of this Rule exists from previous surveying work. Also included will be <br />the following: <br />- area limits of ail solid waste management facilities and facility infrastructure, <br />including landfill units and buffer requirements set forth in 15A NCAC 13B .0544 (1); <br />- area limits of grading, including borrow and stockpile; and <br />- the physical features referenced in Rule 15A NCAC 13B .0536 (Location Restrictions). <br />^ Site Development Sheet 2 will contain the phases of development, which do not exceed <br />approximately five years of operating capacity. <br />^ Site Development Sheet 3 will contain proposed final contours for the C&D landfill unit <br />and facility feature for closure. <br />^ Landfill Operation Sheets 1-5 will contain proposed transitional contours and <br />construction grading for the new phases. <br />Task 4.2 -Facility Report <br />CDM will prepare the Facility Report, which includes the following as required under Rule <br />.0537(e): <br />1. Waste Stream -This section will include a discussion of the characteristics of the waste <br />received at the facility and facility-specific management plans including: <br />^ the types of waste specified for disposal; <br />^ average yearly disposal rates and a representative daily rate; <br />^ the geographical area served by the facility; <br />^ procedures for segregated management at different on-site facilities; and <br />^ equipment requirements for operation of the C&D landfill unit. <br /> <br /> <br />2. Landfill Capacity -This section will contain an analysis of the landfill capacity and soil <br />resources which includes volumetric estimates of: <br />^ total operating capacity; <br />^ operating capacity for each phase of development; <br />^ in-place ratio of waste to soil; <br />^ available soil resources from on-site; <br />n <br />^ required quantities of soil for landfill construction, operation, and closure; and <br />^ the estimated operating life of all C&D landfill phases iun years. <br />b Item# 9 <br />Attachment number 1 <br />Page 90 of 185 i <br />F-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.