My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 12 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 12 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 3:10:17 PM
Creation date
11/27/2017 11:29:45 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 5.2 - Engineexing Drawings <br />CDM will prepare the following Engineering Drawings as required under Rule .0539(e): <br />^ Engineering Plan Sheet 1 will contain the existing conditions including site topography, <br />features, existing disposal areas, roads and structures. <br />^ Engineering Pian Sheet 2 will contain the grading plan including proposed Imits of <br />excavation and subgrade elevations. <br />^ Engineering Pian Sheet 3 will contain the cap system including base and top elevation, <br />landfill gas devices, infiltration barrier, surface water removal, protective and vegetative <br />cover, and details. <br />^ Engineering Plan Sheet 4 will contain temporary and permanent sedimentation and ~ <br />erosion control measures. <br />^ Engineering Plan Sheets 5 - 7 wiU contain vertical separation requirrements cross-sections. <br />^ Engineering Plan Sheet 8 will contain vertical separation requirements in plan view, <br />existing ground surface and base grades cross-sections. <br />^ Engineering Plan Sheets 9-12 will contain miscellaneous details. <br />Task 5.3 -Geotechnical Analysis <br />CDIVI's geotechnical engineers will review the subsurface information collected under Task 3, <br />and CDM will perform up to one additional boring to collect geotechnical data #or the <br />geotechnical analyses to supplement the data collected for the hydrogeological investigation. <br />CDM will perform geotechnical laboratory tests on selected samples. <br />The groundwater contours for the subsurface design profile will be obtained from the Design <br />Hydrogeologic Reports. Geotechnical analyses required for the overall C&D. footprint will be <br />performed based upon the subsurface design profile and proposed landfill geometry. The <br />analyses will include global and veneer stability analyses, settlement analyses of the existing <br />landfill materials and the piggybacked C&D materials, and analyses for the design of the <br />proposed separation liner system underneath the piggybacked C&D materials. Results of the <br />analyses and recommendations will be incorporated into the landfill design and presented in a <br />geotechnical report (included as an appendix to the Engineering Plan).The following subtasks <br />outline the proposed approach to the geotechnical analyses: <br />5.3.1 Geotechnical Laboratory Testing - In addition to the testing performed under Task 3, the <br />following laboratory testing will be conducted on selected samples collected during drilling. <br />^ Two grain-size analyses (ASTM D422} <br />^ Five moisture contents (ASTM D2216) <br />^ Two Atterberg Limits (ASTM D4318) <br />8 Item# 9 ~' <br />F-5 <br />Attachment number 1 <br />Page 92 of 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.