My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 12 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 12 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 3:10:17 PM
Creation date
11/27/2017 11:29:45 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />^ One specific gravity test (ASTi~1 D854) <br />^ One. standard proctor compaction test (ASTM Db98) <br />^ One One-dimensional Consolidation tests (ASTM D2435) <br />^ One Consolidated Undrained Triaxial Tests (ASTM D4767) <br />5.3.2 Geotechnical Report -CDM will prepare a geotechnical report presenting the data <br />gathered during the subsurface exploration and laboratory testing and the results of the <br />geotechnical analyses. The report will also contain geotechnical recommendations for the <br />design and construction of the proposed landfill. <br />TASK 6 -CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />CDIvI will prepare a CQA plan in accordance with Rule .0541. Tie CQA plan will describe the <br />observation and tests that will be used before, during, and upon completion of construction. <br />The CQA plan will address the construction and materials design specifications and the <br />construction and certification requirements set forth in Rule .0540. The CQA plan will also <br />describe the procedures that will be required to maintain the integrity of the landfill systems <br />prior to waste placement. It should be noted that this amendment does not include <br />implementation of the CQA plan or the preparation of certification documents after construction <br />in support of the request for a Permit to Operate. These services will be included in a future <br />amendment covering services during construction. The CQA plan will include the following: <br />' ^ responsibilities and authorities for the construction management organization and a list <br />of topics to be covered at the pre-construction meeting including a discussion of the <br />construction management organization, respective duties during construction, and <br />' periodic reporting requirements for test results and construction activities; <br />^ description of all field observations, tests and equipment that will be used to ensure that <br />' the construction meets or exceeds all design criteria established in Rules .0539, .0540 and <br />.0543(d); <br />' ^ description of reporting requirements for CQA activities; and <br />^ a plan for holding daily and monthly troubleshooting meetings. The proceedings of the <br />' meetings must be documented. <br />TASK 7 -OPERATIONS PLAN <br />' CDM will prepare an Operations Plan, which contains applicable drawings and a report that <br />presents the information required in Rule .0542. <br />' Task 7.1-Operation Drawings <br />CDM will prepare the follo~~ing Operation Drawings as required under Rule .0542(b)(1): <br />^ Operarion Plan Sheet 1 will contain existing conditions, any asbestos disposal areas, and <br />buffers. <br />' 9 <br />Item# 9 <br />Attachment number 1 <br />' Page 93 of 185 <br />F-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.