Laserfiche WebLink
Mr. Soave t.itll•, DklCtor <br />February 27, 2006 <br />Page 3 <br />Change Order ii? for thegeogrid and additional stone installation in the sub•grade will be <br />needed to stabilize the parking lot, estimated cast for the addUlonal wank and additional <br />services by Trigon far the to date contract and amrxrnt to i(nish the project are attached for <br />review. <br />• The 12 inches of undercut, the placement o(the t2 Inches additional atone and <br />the Inatallatfon of the geogrid will be;39,736 (See the breakdown attachment <br />from Ikeg' Construclian far itemized informattan). <br />• The undercut of the seeding area, temporary seeding of the parking lot and the <br />re-mobilization fee will be 57040. <br />• Trigon has contracted with Cabarrus County Parks for a maximum of 55000 as <br />pelt of the contingency, but hoe only performed S468g.75 to date. The <br />additionabtest for the additional stone placdtient snd testing the compaction <br />will exceed the total 55000 original aontracland will need to allocate an <br />additional si3000 to the original contract. (Sae the breakdown attachment from <br />Trigon Engineering Consultants, Inc. for itemized Information). <br />• The total amount needed for the yt9,178.00. <br />If there are additional questions, please call me to let me know. <br />Sincerely, <br />W K Dickson ~ Co., Inc. <br />. Steven Whaley, PE <br />Project Manager <br />~-aa <br />