My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2004 05 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2004
>
AG 2004 05 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 9:19:36 PM
Creation date
11/27/2017 11:37:54 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/17/2004
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY.04'2004 16:05 704 333 0845 HIMLEY-HORN CHARLOTTE #4246 ?.013/019 <br /> <br />and Associates, Inc. <br /> <br />within the study area. To obtain total traffic volumes, the site traffic volumes will <br />be added to the existing traffic volumes plus background traffic growth for a five. <br />year build-out. Based on discussions with you, we will u~ a 1% annual traffic <br />growth ram, and no approved developments will be included in the analysis. A <br />detailed traffic engineering capamty analysis will be prepared under existing <br />conditions, futru~: baclq,n'ound conditions, and future build-out conditions at the <br />following cxt~u-nal full-movement intersections: <br /> <br />· Cabarrus Avenue and Union Cemetery Road <br /> Cabarms Avenue and US 601 <br />· Cabarrus Avenue and under.-mined access drive <br />· US 601 and full movement access drive <br /> Union Cemetery Road mud northern ful{ mov~I'n,a'lt access drive <br /> Union Cemetery Road and southern full movement access drive <br /> <br />Based on thc results of the c~a~ analyses, gencral recommendations for needed <br />roadway and operational improvements will be developed for the existing <br />roadway networks affected by thc proposed project. Th~se recommendations will <br />be subject to your review prior to £malization. <br /> <br />Task 3 - Tra. l~c [mpact Study Report <br /> <br />We will produce a final traffic impact study report that presents the findings of <br />Tasks 1-2. Wc will provide five copies to you for distribution. <br /> <br />Task4-Meeffngs <br /> <br />We will prepare for and attend mceUngs with Com~-rstone, Cabarrus County, <br />NCDOT, or others as d/re~ed by you, <br /> <br />Additional Selwices <br /> <br />Any services not specifically provided for in the above mOl:m, as well as any <br />changes in the scope you request, will be considered additional services and will <br />be {:~'forme. d at our then current hourly rates as we agree {:,5or to then' <br />performauce. Additional so-vices may includc services such as: <br /> <br />· Performing additional capacity analyses <br /> P~'forming a review ofsisht-distancc requirements <br /> Performing signal warrant analys~s <br /> Performing Wafftc counts <br /> <br />Schedule <br /> <br />P:~,4K'I%mktxxx ~b~rrus count]Nffd count~ fl.rgounds prope~l.do~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.