Laserfiche WebLink
repair of SR I 154, the mount of which if required will be split accordingly at a later date <br />by the various developers. A separate bond for construdtion of the turn lane on SR 1154 <br />will be posted by Craft prior to issuance of the driveway permit. <br /> <br />Ms. Wagner stated that Bost Development has agreed to do the mm lane on SR 1153 <br />in conjunction with the St. Andrews Subdivision and that she is also presently <br />reviewing a subdivision plan submitted by Moser Construction with a main entrance <br />on Zion Church Rd. and a secondary entrance on Piney Church Kd., which also shows' <br />improvemems to SR 1154. Note: We also have a secondary stub out into Moser's <br />proposed subdivision. <br /> <br />ctively Submitted, <br /> <br />)an Johnson, <br /> <br /> <br />