Laserfiche WebLink
Highland Hills Subdivision <br />1. Provide a continuous-left mm lane extending the entire distance between the two proposed entrances <br /> with a 150' full width storage lane, 90' bay taper and 125' approach and departure tapers. (given <br /> symmetrical widening). It is our recommendation that the Eastern most entrance be changed to the <br /> Road "D" location eliminating a Road "C" connection to SR 1154, Piney Church Road. <br />2. Extend the storage of the newly constructed left turn lane on SR 1155, Zion Church Road at <br /> SR 1154, Piney Church Road, to provide a 300' full width storage lane. <br />3. Provide internal street connection to RamsGate Subdivision. <br />4. A PE/PLS Certification Statement (copy attached) must be completed and must also accompany the <br /> driveway permit package. The document verifies right of way for the required roadway <br /> improvements. <br />5. A review by the City of Concord will be required with expected adherence to City street standards. <br />6. A Traffic Impact Analysis must be performed with consideration given to the RamsGate <br /> Development interconnectivity. <br /> <br />The previous requirement to post a bond for the maintenance and repair of SR 1154, Piney Church Road, <br />remains in effect. Additionally, separate bonds will be required for the roadway improvements prior to the <br />issuance of driveway permits. <br /> <br />If additional information is required, please advise. <br /> <br /> <br />