Laserfiche WebLink
II (doublewide) and not older than 1976. This is different because the existing <br />ordinance will allow a single wide mobile to be used if the nonconforming home <br />is a single wide. <br /> <br />Reconstruction of damaqed structures- both the existing ordinance and the <br />UDO will permit the reconstruction of a .nonconforming structure if the <br />destruction was the result of an act of God.- The existing ordinance requires a <br />building permit to be secured within one year of the event that destroyed the <br />structure. The UDO does not put a limitation on when the reconstruction should <br />take place. In addition, both ordinances agree that if a proper owner willingly <br />removes a nonconforming structure, it cannot be replaced except with a <br />conforming use and/or structure. <br /> <br />13.2 <br />Comparison of Vested Rights <br /> <br />Both the existing zoning ordinance and the UDO provide a method for a property <br />owner to vest or secure his fights to develop their property in a manner that is in <br />compliance with existing regulations even after new regulations are adopted. <br />The method or procedure set forth in both ordinances is very similar. The <br />property owner must complete an application including a site specific <br />development plan and submit it to the County. The Planning and Zoning <br />Commission will review the proposed development in accordance with the <br />current regulations. ]:f approved, the property owner will have a period of time <br />in which to begin their development. The approval of the vested rights runs with <br />the land and therefore the property can be sold to another entity that will enjoy <br />the same vested rights. <br /> <br />Site Specific Development Plan- these plans are required by both the <br />existing ordinance and the UDO. The existing ordinance is not too specific about <br />what should be included in this plan. The UDO is much more specific about the <br />process and the contents of the plan. This will enable the Planning and Zoning <br />Commission and the ordinance administrator to review and better understand <br />the proposed project. <br /> <br />Vested Periods- the existing zoning ordinance will allow the Planning and <br />Zoning Commission to grant a vested period of two years for a proposed <br />development. The UDO will permit a vesting period of two to five years. This is <br />in line with the General Statutes however at the adoption of the existing <br />ordinance the Board of Commissioners chose to limit the vesting period to two <br />years. <br /> <br /> <br />