My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 02 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 02 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:04:26 PM
Creation date
11/27/2017 11:50:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/16/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YOU ARE REQUIRED TO INSTALL ADEQUATE <br />SEDIMENT CONTROL MEASURES ON YOUR <br />PROPERTY. CONSTRUCTION WILL NOT BE <br />ALLOWED TO CONTINE IF SEDIMENT <br />CONTROLS HAVE NOT BEEN ADEQUATELY <br />INSTALLED. <br /> <br />CONSTRUCION SEQUENCE <br /> <br />OBTAIN ALL NECESSARY PERMITS. <br />INSTALL GRAVEL CONSTRUCTION ENTRANCE, SILT FENCE, OR OTHER ADEQUATE <br />SEDIMENT CONTROL MEASURES. <br />BEGIN CLEARING AND GRUBBING LAND. <br />TEMPORARY SEED AND STRAW MULCH OUT SIDE ACTUAL BULLING AREA, TO HELP <br />CONTROL SOIL EROSION. <br />COMPLETE GRADING. <br />STABILITY~ THE SHE WITH ADEQUATE GROUND COVER TO RESTRAIN THE SOIL FROM <br />EXCELARATED EROSION. <br />REMOVE SEDIMENT AND EROSION CONTROL MEASURES AVIER THE SIrE HAS BEEN <br />STABILIZED. <br /> GENERAL NOTES <br /> <br />CERTIYlCATE OF OCCUPANCY WILL NOT BE ISSUED AND/OR FINES MAY BE ASSESSED I1: THE S[IE IS <br />IN VIOLATION WITH CABARRUS COUNTY SOIL EROSION Al,IS SEDIMENTATION CONTROL <br />ORDINANCE. <br /> <br />SEDIMENT CON'i'ROLS (SILT FENCE) MUST BE MAINTAINED AFTER EACH RAINFALL EVENT. <br /> <br />STONE MUST BE PLANCED ALONG THE UPSTREAM OR UPSLOPE SIDE OF ~ SILT FENCE TOE <br />AND/OR BOTTOM, TO ANCHOR FENCE. (SEE CONSTRUCTION DETAILS.) <br /> <br />SILT FENCE MUST BE INSTALLED ALONG THE LOW POINTS AND/OR LOW SIDES OF THE SI'Iii. <br /> <br />SILT FENCE IS NOT TO BE INSTALLED AT THE OUTLETS OF PIPES OR AREAS OF CONCENTRATED <br />FLOW. <br /> <br />HAY BALES ARE NOT CONSIDERED AN ACCEPTABLE SEDIMENT AND EROSION CONTROL PRACTICE, <br />THEREFORE HAY BALES ARE NOT ALLOWED. <br /> <br />PROPERTY LINE <br /> <br />~_ STRUCTURE <br />~ SILT FENCE <br /> <br />DIRECTIONAL <br />FLOW ARROWS <br /> <br />TEMPORARY <br />GRAVEL <br />CONSTRUCTON <br />ENTRANCE / EXIT <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.