Laserfiche WebLink
YOU ARE REQUIRED TO INSTALL ADEQUATE <br />SEDIMENT CONTROL MEASURES ON YOUR <br />PROPERTY. CONSTRUCTION WILL NOT BE <br />ALLOWED TO CONTINE IF SEDIMENT <br />CONTROLS HAVE NOT BEEN ADEQUATELY <br />INSTALLED. <br /> <br />CONSTRUCION SEQUENCE <br /> <br />OBTAIN ALL NECESSARY PERMITS. <br />INSTALL GRAVEL CONSTRUCTION ENTRANCE, SILT FENCE, OR OTHER ADEQUATE <br />SEDIMENT CONTROL MEASURES. <br />BEGIN CLEARING AND GRUBBING LAND. <br />TEMPORARY SEED AND STRAW MULCH OUT SIDE ACTUAL BULLING AREA, TO HELP <br />CONTROL SOIL EROSION. <br />COMPLETE GRADING. <br />STABILITY~ THE SHE WITH ADEQUATE GROUND COVER TO RESTRAIN THE SOIL FROM <br />EXCELARATED EROSION. <br />REMOVE SEDIMENT AND EROSION CONTROL MEASURES AVIER THE SIrE HAS BEEN <br />STABILIZED. <br /> GENERAL NOTES <br /> <br />CERTIYlCATE OF OCCUPANCY WILL NOT BE ISSUED AND/OR FINES MAY BE ASSESSED I1: THE S[IE IS <br />IN VIOLATION WITH CABARRUS COUNTY SOIL EROSION Al,IS SEDIMENTATION CONTROL <br />ORDINANCE. <br /> <br />SEDIMENT CON'i'ROLS (SILT FENCE) MUST BE MAINTAINED AFTER EACH RAINFALL EVENT. <br /> <br />STONE MUST BE PLANCED ALONG THE UPSTREAM OR UPSLOPE SIDE OF ~ SILT FENCE TOE <br />AND/OR BOTTOM, TO ANCHOR FENCE. (SEE CONSTRUCTION DETAILS.) <br /> <br />SILT FENCE MUST BE INSTALLED ALONG THE LOW POINTS AND/OR LOW SIDES OF THE SI'Iii. <br /> <br />SILT FENCE IS NOT TO BE INSTALLED AT THE OUTLETS OF PIPES OR AREAS OF CONCENTRATED <br />FLOW. <br /> <br />HAY BALES ARE NOT CONSIDERED AN ACCEPTABLE SEDIMENT AND EROSION CONTROL PRACTICE, <br />THEREFORE HAY BALES ARE NOT ALLOWED. <br /> <br />PROPERTY LINE <br /> <br />~_ STRUCTURE <br />~ SILT FENCE <br /> <br />DIRECTIONAL <br />FLOW ARROWS <br /> <br />TEMPORARY <br />GRAVEL <br />CONSTRUCTON <br />ENTRANCE / EXIT <br /> <br /> <br />