Laserfiche WebLink
-- UNR-Rohn <br /> <br />Page 3 <br /> <br /> Should the existing soil found to be other as described in the soils report and the above <br /> stated soil parameters, ROHN may ask for an equitable ad!u.s,,t?_ent t_o the quoted price. <br /> <br />13. ROHN has included a copy of Certification of Insurance which will be provided for the <br /> installation portion of the project. <br /> <br />14. Installation prices are based on the following: <br /> a) Contractor using their normal erection procedures <br /> b) Good site accessibility for trucks delivering tower <br /> steel and concrete <br /> c) Non-union, non-prevailing wages and non-winter <br /> working conditions <br /> d) Price assumes all antennas, lines and attachment <br /> hardware are supplied by others on site at the time <br /> the tower is being erected <br /> e) Customer to secure all permits <br /> f) Transportation charges to the tower site <br /> <br />15. <br /> <br />Installation includes: <br /> a) Installing drilled pier foundations based upon soils <br /> report and soils parameters. <br /> Installing dual lights. <br /> <br />b) <br />c) <br />d) <br /> <br />e) <br />f) <br />g) <br />h) <br />i) <br /> <br />J) <br />k) <br /> <br />Installing <br />Installing <br />Installing <br />Installing <br />Installing <br />Installing <br />Installing <br />Fine. <br /> <br />climbing ladder. <br />ROHN-Ioc safety device. <br />special grounding with test welds. <br />one 15 hole waveguide ladder assembly. <br />three 6' side arms. <br />three whip antennas, <br />approximately 320' of 1-518" transmission <br /> <br />Installing 640' of 718" transmission line. <br />Supplying and installing snap in hangers. <br /> <br />16. Certificate of Insurance enclosed with Bid Proposal. <br /> <br />Rodney B. Harrison <br />Vice President <br /> <br />RBH:ju <br /> <br /> <br />