My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1995 08 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1995
>
AG 1995 08 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:37:00 PM
Creation date
11/27/2017 11:57:40 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/21/1995
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Furnish required sets of plans and specifications for use by <br /> Owner, regulatory agencies and Contractors. <br /> <br />For services i, 2 and 3 the Engineer is to be paid by the Owner <br />as indicated in Part IV, Number 10. <br /> <br />Provide assistance in advertising for bids, securing a list <br />of qualified bidders for the project, taking bids and <br />advising the Owner as to the best bids to accept. <br /> <br />5. Prepare formal contract documents for award of contract. <br /> <br />For services 4 and 5, the Engineer is to be paid by the Owner as <br />indicated in Part IV, Number 9. <br /> <br />The plans and specifications phase will terminate with the <br />evaluating of bids, negotiating of proposals and preparing <br />construction contracts. <br /> <br />Part III - Engineering Services during Construction <br /> (if desired) <br /> <br />After the awarding of construction contracts and upon written <br />request from the Owner, the Engineer will provide part-time <br />engineering services during construction. These services will <br />include the following: <br /> <br />Observation of the work performed by the Contractor to assure <br />compliance with the plans and specifications and receiving <br />first-class workmanship and materials. (See Item 8) <br /> <br />2. Preparation of monthly construction cost estimates for use as <br /> a basis for payment to the Contractor. (See Item 8) <br /> <br />3. Keep Owner fully informed as to the progress of the work and <br /> status of the project. <br /> <br />4. Issue instructions of the Owner to the Contractor and prepare <br /> Change Orders. <br /> <br />5. Provide assistance in tune-up and testing equipment. <br /> <br />6. Provide liaison between Owner, regulatory agencies and the <br /> Contractor. <br /> <br />o <br /> <br />Final inspection and certification of the project, including <br />one set of blue line "Construction Record Drawings". (See <br />Item 8) <br /> <br />8. A full-time resident for construction observation should be <br /> furnished by Owner. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.